Procurement advice and road surface anti-slip materials
Inkoop advies en materieel gladheidsbestrijding
Netherlands · Lichtenvoorde · how to bid here →
Your path to submission
- Deadline: 8 October at 11:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (15 awards since 2015, spread over 7 companies). 100% went to new names.n = 15 awards since 2015
- The median procedure drew 3 bids (13 procedures with a bid count); 8% ended with a single bidder. Sector: median 3 bids.n = 13
- 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 8%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Construction materials, 31 contracts went to foreign companies over the last 3 years (of 405 recorded awards) — mostly from Germany, Belgium, France.
Submission language: NLD.
Typical field: median 3 (from 339 awards).
What the buyer is looking for
The scope of the assignment is to prepare the smoothness control together with the client, to supply and maintain the necessary equipment and material for the smoothness control and to support in the implementation of the smoothness control. In order to avoid a fragmented procurement, a task-oriented approach has been chosen. Outside of this purchase are: o Supplying salt and brine; o Coordinate and implement anti-smoothing; o The management and maintenance of the municipal road surface measuring points; o Providing Meteorological Support. - Develop and implement a new anti-slip plan (policy and operational); - Delivery/rent/lease etc. of replacement winter machinery: keeping the municipal fleet of winter machinery up to date (operational, reliable); - Route guidance systems and vehicle tracking: implement, keep efficient and operational; - Upgrading and maintaining the knowledge level…
Show full description
… of employees; - Applying innovations (encouraging and exploiting them), completing tasks as sustainably as possible; - Achieve annual smoothness control in cooperation in a sustainable and integral way; - Achieving the sustainability challenge: 50% reduction in CO2 emissions and 50% circular action by 2030; - Making the start towards the sustainability challenge: fully climate-neutral and circular action by 2050.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Alferink BV | 1 | 2015 |
| Seesing Flex | 1 | 2024 |
| REMONDIS Smart Infra B.V. | 1 | 2026 |
| ASR Schadeverzekering N.V. | 1 | 2025 |
| RANDSTAD | 1 | 2024 |