Dynamický nákupní systém na zhotovení studií proveditelnosti FVE
Czechia · Brno · how to bid here →
Your path to submission
- Deadline: 31 December at 23:55 — 88 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES, SLK.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 42% of this buyer's awards went to companies that had already won here before (281 awards since 2015, spread over 81 companies). That is well below the sector norm (78%) — this buyer switches suppliers more often than others.n = 281 awards since 2015
- The median procedure drew 4 bids (255 procedures with a bid count); 20% ended with a single bidder. Sector: median 4 bids.n = 255
- 4% of awards went to companies from abroad (281 awards with a known winner country). Sector average: 8%.n = 281
- < 1% of the bids received came from other countries (163 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 163
- 88% of the bids received came from small and medium-sized enterprises (163 procedures with a bid mix). Sector: 92%.n = 163
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Czechia · Architecture & engineering, 449 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, France, Austria.
Typical field: median 6 (from 8 awards).
What the buyer is looking for
The following activities will be the subject of DNS and public contracts subsequently awarded under DNS: a) basic construction-technical survey of designated buildings owned by the South Moravian Region; b) carrying out a feasibility study of the plan to install photovoltaic power plants on buildings owned by the South Moravian Region; elaboration of relevant expert opinions; e) the design of construction-technical or design-engineering measures necessary for the installation of the PV plant, including an estimate of the costs of such measures; processing of the connection request, including the single-pole connection scheme of the plant; g) ensuring the opinion of the competent building authority that the plan for the installation of the PV plant is not subject to its permission. The subject of individual public contracts awarded in the DNS is always determined by the contracting authority according to current needs, taking into account, among other things, the requirements of subsidy titles.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SMERO, spol. s r.o. | 18 | 2022–2026 |
| ENGEL s.r.o. | 9 | 2024–2026 |
| KSP Computer & Services Moravia, s.r.o. | 9 | 2024–2026 |
| MONIT plus, s.r.o. | 8 | 2024–2026 |
| Granimex CZ s.r.o. | 8 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.