European public procurement - Building installation maintenance
Europees openbare aanbesteding - Onderhoud installatie gebouwen
Netherlands · Coevorden · how to bid here →
Your path to submission
- Deadline: 13 October at 10:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD, NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (57 procedures with a bid count); 26% ended with a single bidder. Sector: median 5 bids.n = 57
- 3% of this buyer's awards went to companies that had already won here before (63 awards since 2015, spread over 29 companies). 97% went to new names.n = 63 awards since 2015
- 30% of the bids received came from small and medium-sized enterprises (28 procedures with a bid mix). Sector: 41%.n = 28
- 10% of awards went to companies from abroad (63 awards with a known winner country). Sector average: 8%.n = 63
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 5 (from 2,396 awards).
What the buyer is looking for
In the context of professional and future-proof property management, the municipality wishes to organise the maintenance of the building installations in a structured and efficient manner. The assignment includes both planned (preventive) maintenance and corrective maintenance, including the repair of malfunctions, the execution of adjustments and replacements including inspections and checks. With this tender request, the municipality aims to contract several contractors who will be responsible for carrying out the maintenance of the building installations during the contract period. A distinction is made between a fixed component, consisting of planned maintenance, and a flexible component, consisting of work carried out on demand. The contract is divided into several lots, with each lot relating to several buildings with the corresponding technical installations. The maximum value of…
Show full description
… this framework agreement is € 2.500.000,- excluding VAT for the total duration, including any extensions and for all lots together.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Van Gelder Verkeerstechniek B.V. | 2 | 2025 |
| Intermont Assuradeuren B.V. | 2 | 2024 |
| Achmea Schadeverzekeringen N.V. | 1 | 2024 |
| Ergo Versicherung AG, branch office The Netherlands | 1 | 2024 |
| xxllnc Productiviteit B.V. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.