Supply of technical materials and tools VRGZ
Levering technische materialen en gereedschappen VRGZ
Netherlands · NIJMEGEN · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 3% of this buyer's awards went to companies that had already won here before (62 awards since 2015, spread over 23 companies). 97% went to new names.n = 62 awards since 2015
- The median procedure drew 2 bids (56 procedures with a bid count); 25% ended with a single bidder. Sector: median 3 bids.n = 56
- 8% of awards went to companies from abroad (62 awards with a known winner country). Sector average: 14%.n = 62
- The award came in at a median 82% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Electrical machinery, 26 contracts went to foreign companies over the last 3 years (of 209 recorded awards) — mostly from Germany, Italy, France.
Submission language: NLD.
Typical field: median 3 (from 158 awards).
What the buyer is looking for
The Gelderland-Zuid Safety Region (VRGZ) intends to contract one or more suppliers for the supply of MRO (Maintenance, Repair and Operations) articles. These include consumables and consumables, installation materials, luminaires and workshop-related Personal Protective Equipment (PPE). In this document, these articles are collectively referred to as MSP articles. The VRGZ strives to contract a limited number of one stop shop suppliers. Where possible, one supplier is contracted per lot. The scope of the Framework Agreement is based on the contracting authority's Spend analysis. On top of this, a safety margin of 30% is maintained, due to geopolitical reasons (price increases) and unforeseen circumstances, in order to prevent us from using them earlier within the maximum term of the Framework Agreements. The maximum scope of the Framework Agreements: • Lot 1: Installation material: €…
Show full description
… 800,000, - including VAT. • Lot 2: Consumables: € 700,000, - including VAT. However, the contracting authority cannot guarantee the number of contracts to be awarded and the expected turnover for the coming contract period. Tenderers cannot derive any rights from the figures provided in the procurement documents.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kenbri Fire Fighting B.V. | 2 | 2025–2026 |
| RAM Infotechnology B.V. | 2 | 2025–2026 |
| Active Living B.V. | 1 | 2023 |
| Abbott B.V. | 1 | 2025 |
| Dräger Nederland B.V. | 1 | 2026 |