Reconstruction N554
Reconstructie N554
Netherlands · Horst · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (49 awards since 2015, spread over 17 companies). That is well below the sector norm (17%) — this buyer switches suppliers more often than others.n = 49 awards since 2015
- The median procedure drew 3 bids (45 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 45
- 10% of awards went to companies from abroad (49 awards with a known winner country). Sector average: 2%.n = 49
- 16% of the bids received came from small and medium-sized enterprises (17 procedures with a bid mix). Sector: 29%.n = 17
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,392 recorded awards) — mostly from Belgium, Germany, Italy.
Submission language: NLD.
Typical field: median 4 (from 1,953 awards).
What the buyer is looking for
Reconstruction N554 See RAW specifications Reconstruction N554 with reference BJ2118 · See specifications with reference BJ2118 See specifications with reference BJ2118
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Herman Vaessen B.V. | 2 | 2025 |
| Mandatis | 2 | 2015–2025 |
| Van Tilburg Energie Design B.V. | 1 | 2026 |
| Van de Bijl & Heierman B.V. | 1 | 2021 |
| Roodbeen B.V. | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.