Conclusion of a non-exclusive framework agreement for preliminary investigations & control inspections in the open-house procedure of the West branch
Abschluss eines nicht-exklusiven Rahmenvertrages Voruntersuchungen & Kontrollprüfungen im Open-House Verfahren der Niederlassung West
Germany · Montabaur · how to bid here →
Your path to submission
- Deadline: 31 December 2028 at 12:00 — 816 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (167 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to Vermessungsbüro Elmar Neuroth.n = 167
- 66% of this buyer's awards went to companies that had already won here before (503 awards since 2021, spread over 168 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 503 awards since 2021
- The median procedure drew 2 bids (494 procedures with a bid count); 38% ended with a single bidder. Sector: median 3 bids.n = 494
- 75% of the bids received came from small and medium-sized enterprises (223 procedures with a bid mix). Sector: 90%.n = 223
- From notice to award takes a median 76 days here (141 procedures). Sector: 133 days.n = 141
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 110,078 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: DEU.
Typical field: median 2 (from 172 awards).
What the buyer is looking for
The subject of the framework contract is the performance of preliminary examinations & control checks in accordance with the specifications of the specifications. The preliminary examinations & control checks are divided into the following performance areas: Performance range 01 Pre-excavation of ordnance Performance range 02 Preliminary inspections in road construction Performance range 03 Engineering services Preliminary inspections in road construction Performance range 04 Preliminary inspections in buildings Performance range 05 Engineering services Preliminary inspections in buildings Performance range 06 RAP Stra Specialization A3: Soils including soil improvements Performance area 07 RAP Stra Subject area BB3: Road construction bitumen and br. PmB Performance range 08 RAP Stra Subject area BE3: Bitumen emulsions, flux bitumen Performance range 09 RAP Stra Area of Expertise C3:…
Show full description
… Joint fillers Power range 10 RAP Stra Field of expertise D3: Rock Grains Performance Range 11 RAP Stra Area of Expertise E3: Road slabs made of concrete, concrete load-bearing layers Power range 12 RAP Stra Field of expertise F3: Surface treatments, DSK, DSH, DSH-V Power range 13 RAP Stra Field of expertise G3: Asphalt Performance range 14 RAP Stra Field of expertise H3: Load-bearing layers with hydraulic binders, floor solidifications Power range 15 RAP Stra Specialization I3: Layers without binders and mixtures of building materials for earthworks Performance range 16 Performance tests on asphalt and bituminous binders Performance range 17 Flatness measurements according to TP Eben - Contact measurements Performance range 18 Grip measurements according to TP Griff-StB (SKM) Performance range 19 Road markings according to ZTV M Performance range 20 Concrete testing and monitoring ÜK 2/3 according to DIN 1045-3 The performance ranges are hereinafter also referred to as "lots" due to the specification of terms in this notice form. The framework contracts for the provision of the services specified in the specifications (Annex 1 to the framework contract) are concluded by means of a so-called "open house procedure" (see further details in the Additional information section and in the cover letter, which can be accessed via the electronic address specified in the Communication section). The framework contract to be concluded includes, for each contractor individually, those areas of work described in more detail in the terms of reference (Annex 1 to the framework contract) for which the admission requirements have been demonstrated with the application for admission. Specific contracts awarded on the basis of the framework contract concluded may cover all services or only parts of one or more service areas for which a contractor has been authorised. The open house procedure runs from publication until 31.12.2026 and can be extended twice for 1 year each. Applications for admission and thus also the conclusion of a framework contract can be made during the entire duration of the open house procedure. A framework contract enters into force with the approval of an interested party and ends on 31.12.2026, subject to renewal options. The framework contract can be extended twice until 31.12.2027 or 31.12.2028 - similar to the open house procedure - due to the extension option. More details are provided in the framework contract.
What you must prove — eligibility criteria
(1) Kein zwingender oder fakultativer Ausschluss unter entsprechender Anwendung der §§ 123, 124 GWB sowie entsprechender Berücksichtigung von §§ 125, 126 GWB. Zur Prüfung wird eine Eigenerklärung gemäß Vordruck im Zulassungsformular gefordert. (2) Erfüllung de… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Eiffage Infra-Südwest GmbH · Alzey | 19 | 2024–2026 |
| Siemens Aktiengesellschaft RC-DE SI B · Berlin | 18 | 2025 |
| Heinz Schnorpfeil Bau GmbH · Treis-Karden | 12 | 2022–2026 |
| REMONDIS GmbH | 9 | 2024–2026 |
| Wallstop GmbH & Co. KG · Treis-Karden | 9 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.