Pedestrian and Bicycle Bridge on Jesenského Street in Nitra.
Pešia a cyklistická lávka na ul. Jesenského v Nitre.
Slovakia · Nitra · how to bid here →
Your path to submission
- Deadline: 30 November at 17:00 — 58 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (25 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to MNPA s.r.o..n = 25
- 34% of this buyer's awards went to companies that had already won here before (101 awards since 2017, spread over 35 companies). 66% went to new names.n = 101 awards since 2017
- The median procedure drew 3 bids (90 procedures with a bid count); 19% ended with a single bidder. Sector: median 4 bids.n = 90
- The award came in at a median 73% of the estimated value (11 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 78%.n = 11
- < 1% of the bids received came from other countries (69 procedures with a bid mix) — all bidders, not just the winners. Sector: 4%.n = 69
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Slovakia · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 753 recorded awards) — mostly from Czechia, Germany, Sweden.
Typical field: median 2 (from 25 awards).
What the buyer is looking for
The city of Nitra is looking for a high-quality architectural design of the footbridge, which combines the beauty of the design solution, functionality and collision-free functioning in the premises of the footbridge and on it. The solution is expected to work with genius loci, looking for broader connections on the axis of the castle – river – hill. High emphasis is also placed on a comprehensive architectural and urban view of the downstream public space around the footbridge, respecting the natural environment of the river and the proximity of the park.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| iProdos s.r.o. | 13 | 2025–2026 |
| BAUMANN Nitra s.r.o. | 11 | 2026 |
| MNPA s.r.o. | 6 | 2025–2026 |
| ZSE Energia, a.s. | 3 | 2024–2025 |
| INMEDIA, spol. s r.o. | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.