Zvolen - weir, ensuring longitudinal continuity and making the concrete slide under the weir and the weir itself passable
Zvolen - hať, zabezpečenie pozdĺžnej kontinuity a spriechodnenie betónového sklzu pod haťou a samotnej hate
Slovakia · Bratislava - mestská časť Karlova Ves · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 16 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 5% of this buyer's awards went to companies that had already won here before (121 awards since 2017, spread over 30 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 121 awards since 2017
- The median procedure drew 2 bids (92 procedures with a bid count); 36% ended with a single bidder. Sector: median 5 bids.n = 92
- 33% of awards went to companies from abroad (121 awards with a known winner country). Sector average: 25%.n = 121
- 100% of the bids received came from small and medium-sized enterprises (40 procedures with a bid mix). Sector: 79%.n = 40
- The award came in at a median 83% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 3 (from 4 awards).
What the buyer is looking for
As part of the implementation of the subject of the contract, a large-capacity pool waterway is proposed, which will ensure the opening of three migration barriers – the weir, the concrete slipway and the Zvolen MVE, which prevent the passage of fish and other aquatic animals from the lower part of the Hron stream to the higher part. The proposed fishing line will be located in close proximity to the existing MVE Zvolen. The fishboat will be located on the area between the production facility of the MVE and the left-hand barrier of the Hron. The area currently concerned consists of open grassland, the Zvolen MVE area, the access road to the MVE and the retaining walls of the banks of the partition reservoir and the waste channel. The construction will not significantly affect the main buildings of the MVE. As part of the construction, it will also be necessary to deal with the transfer…
Show full description
… of existing underground lines conducted from the MVE building, the transfer of water pipes. There will also be an intervention on the access road led from the weir crown to the MVE area, where it will be necessary to build a bridge to the proposed fish duct. This bridge needs to be built as one of the first buildings to ensure access to the MVE area during the construction of the fish duct. When building an influent building, the reconstruction of the gabion wall of the partition tank will also be solved. The object of the fish-pipe will be protected by fencing and handrails against the entry of unauthorized persons, as well as protection from falling. Further specification of the subject of the contract is given in Annex 1-1 to the specifications (Description), Annex 1-2 to the specifications (Project) and Annex 2 to the specifications (Contract).
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zemplínska plavebná spoločnosť s.r.o. v skratke používané ako: ZPS s.r.o. | 4 | 2026 |
| Fair Facility s.r.o. | 2 | 2023–2024 |
| SLOVNAFT, a.s. | 2 | 2026 |
| KVANT spol. s r.o. | 2 | 2026 |
| Metal Spiš, s.r.o. | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.