"Oil-filled Adjustable Reactor 400 kV" - supply
„Olejová regulovateľná tlmivka 400 kV“ - dodávka
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 26 October at 10:00 — 22 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: SLK.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (8 awards, most recently October 2025) — by that rhythm the next award was due around February 2026. The last award went to Alter Energo, a.s..n = 8
- 21% of this buyer's awards went to companies that had already won here before (69 awards since 2018, spread over 15 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 69 awards since 2018
- 12% of the bids received came from other countries (29 procedures with a bid mix) — all bidders, not just the winners. Sector: 31%.n = 29
- 32% of awards went to companies from abroad (69 awards with a known winner country). Sector average: 48%.n = 69
- The median procedure drew 4 bids (65 procedures with a bid count); 14% ended with a single bidder. Sector: median 3 bids.n = 65
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Electrical machinery, 51 contracts went to foreign companies over the last 3 years (of 222 recorded awards) — mostly from Czechia, Germany, Poland.
Typical field: median 3 (from 8 awards).
What the buyer is looking for
The subject of the contract is the supply and installation of 400 kV oil-regulating choke, which will be located in the PS SR in the electric station Veľké Kapušany. 200 MVAr oil choke at Un 420 kV (max. continuous operating voltage 430 kV; hereinafter referred to as ‘Inductor’), including testing it at the manufacturing plant, importing, assembling and testing it at the site, and participation and coordination with the builder in putting it into service. The necessary construction and technological part will be covered by the separate PNI well in advance of the delivery date and will be procured by the PP procedure in order not to artificially divide the subject of the contract. The estimated delivery time is 5 years from the signature of the delivery contract. Further information on the subject of the contract is provided in the Contract, including its annexes, which is published at:…
Show full description
… https://sepsas.eranet.sk/#/tenderPublicDetails/1161 Annexes 2, 3 and 8 to the Contract will be provided to candidates in accordance with points 29.7 and 29.8 of the tender specifications.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VUJE, a.s. | 4 | 2024–2025 |
| LiV ELEKTRA, a.s. | 4 | 2024–2025 |
| EGEM, s. r. o. | 3 | 2024–2025 |
| Alter Energo, a.s. | 3 | 2024–2025 |
| ELCON BRATISLAVA, a.s. | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.