SMsZ - Adaptation of administrative building AB-2
SMsZ - Adaptácia administratívnej budovy AB-2
Slovakia · Košice - mestská časť Západ · how to bid here →
Your path to submission
- Deadline: 8 October at 09:00 — 5 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (14 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to EUROVIA SK, a.s..n = 14
- The median procedure drew 3 bids (79 procedures with a bid count); 9% ended with a single bidder. Sector: median 5 bids.n = 79
- 34% of this buyer's awards went to companies that had already won here before (87 awards since 2018, spread over 32 companies). 66% went to new names.n = 87 awards since 2018
- 99% of the bids received came from small and medium-sized enterprises (61 procedures with a bid mix). Sector: 79%.n = 61
- 18% of awards went to companies from abroad (87 awards with a known winner country). Sector average: 25%.n = 87
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 3 (from 14 awards).
What the buyer is looking for
The subject of the contract is the execution of construction works for the project ‘SMsZ – Adaptation of the administrative building AB-2’ on the premises of the Municipal Green Administration in Košice. The main objective of the project is to increase the energy efficiency of the building, improve its technical condition and create better conditions for office spaces and employee changing rooms. In 2026, the original project was revised and a number of technological elements were removed for cost optimisation, in particular photovoltaic panels, heat pump, air-conditioning and other related technical solutions. In particular, construction works aimed at the renovation of the building, such as the replacement of the roof, windows and doors, the insulation of the building, the reconstruction of the interior spaces, the modification of technical wiring, fire measures and the modernisation…
Show full description
… of heating using existing gas boilers, remain the subject of implementation. The detailed scope of work is determined by the revised project documentation and the area statement. In more detail - in the tender documents and their annexes.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| INMEDIA, spol. s r.o. | 5 | 2023–2026 |
| Klas veľkoobchod s.r.o. | 5 | 2023–2026 |
| Goron, s.r.o. | 4 | 2023–2025 |
| ERIK, s.r.o. | 4 | 2023–2025 |
| LUMAZO fruit s. r. o. | 3 | 2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.