R2 Šaca – Košické Oľšany, Section I
R2 Šaca – Košické Oľšany, I. úsek
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 22 October at 10:00 — 18 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (47 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to littlefinger, s.r.o..n = 47
- 18% of this buyer's awards went to companies that had already won here before (376 awards since 2018, spread over 100 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 376 awards since 2018
- The median procedure drew 3 bids (336 procedures with a bid count); 15% ended with a single bidder. Sector: median 5 bids.n = 336
- The award came in at a median 82% of the estimated value (68 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 68
- 9% of the bids received came from other countries (165 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 165
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 4 (from 47 awards).
What the buyer is looking for
The purpose of the proposed construction is to relieve the currently encumbered transport network around the city of Košice as well as in the city itself from transit traffic and at the same time to create a south-east bypass of the city with several new connections to the existing transport system redistribution of source and destination traffic, which will relieve the currently mined entrances to the city. This will increase the fluidity, speed and safety of transport and will significantly improve the traffic-operating conditions for transit traffic. The subject-matter of the contract is set out in detail in Volumes 1 to 5 of these SRs.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Metrostav DS a.s. | 7 | 2024–2026 |
| Eurovia SK, a.s. · 040 17 SK | 6 | 2025–2026 |
| STRABAG s.r.o. | 5 | 2024–2026 |
| DOPRAVOPROJEKT, a.s. | 5 | 2026 |
| Valbek SK, spol. s r. o. | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.