Reconstruction of the football stadium in the city of Sereď – 1st stage
Rekonštrukcia futbalového štadióna v meste Sereď – 1. etapa
Slovakia · Sereď · how to bid here →
Your path to submission
- Deadline: 7 October at 10:00 — 4 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 9% of this buyer's awards went to companies that had already won here before (12 awards since 2018, spread over 4 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 12 awards since 2018
- The median procedure drew just one bid (11 procedures with a bid count); 55% ended with a single bidder. Sector: median 5 bids.n = 11
- 8% of awards went to companies from abroad (12 awards with a known winner country). Sector average: 25%.n = 12
- 4% of the bids received came from other countries (5 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 5
- 78% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 79%.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Typical field: median 5 (from 1,112 awards).
What the buyer is looking for
The subject of the contract is the reconstruction of the football stadium, consisting of the following construction works: • Reconstruction of the existing western tribune of the football stadium, including internal layout modifications, sanitary and operational facilities, VIP and media spaces, • completion of the part of the 1st aboveground floor, modification of the 2nd aboveground floor below the levels of view, and new operational links for spectators, VIP, media and operators, • complete reconstruction of the roofing of the tribune with dismantling, refurbishment, retrofitting of existing steel elements and addition of new steel pylons, curtains and structural elements so as to remove the front supporting pillars impeding the view, • construction modifications, insulation of perimeter structures, replacement of opening structures, ZTI, heating, wiring, weak current and related…
Show full description
… installations, • related premises: water and sewerage connections and distribution, rain sewerage, infiltration facilities, NN distribution, lighting, car parks and paved areas, plumbing, fencing, fire reservoir and mini-football field transfer, including playing area fencing. Further specification is given in Section B.1 Description of the subject of the contract, in the project documentation, in the summary technical report and in the assessment report.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| encare, s.r.o. | 2 | 2024–2025 |
| KONNEX s.r.o. | 1 | 2025 |
| KOMPLEX-odpadová spoločnosť, s.r.o. | 1 | 2025 |
| harcarikarchitekti s. r. o. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.