Friedrich & ClementBETA

Reconstruction of Stromová Regime Workplace

Rekonštrukcia režimového pracoviska Stromová

Slovakia · Bratislava - mestská časť Nové Mesto · how to bid here →

Your path to submission

  1. Deadline: 7 October at 10:00 — 4 days left.
  2. You submit on ÚVO / EVO — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.

Typical field: median 5 (from 1,112 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the realization of construction works within the reconstruction and renovation of part of the building in the built-up area of the city of Bratislava, at the address Stromová 1. The aim is to create a mode workplace in the existing premises of the building, which will meet the requirements of the contracting authority for administrative operation with increased demands for security, technical infrastructure and controlled access. Reconstruction does not change the functional classification of the building as a whole and does not interfere with its volumetric or architectural design towards the exterior, except for local interventions related to the protection of foundation structures. The solution areas are located in a semi-recessed basement of an existing building. They are currently used as office and storage space. The existing premises and their…

Show full description

… operational character do not correspond to the new requirements for the mode workplace in terms of functionality, technical equipment. The building is connected to existing utilities (electricity, water, sewage, heating). The technical equipment of the interior is partially outdated and does not meet the current requirements, therefore it will be subject to a comprehensive reconstruction. The scope of construction works and supplies related to the subject matter of the contract is further specified in the project documentation ,, Reconstruction of the Stromová mode workplace.’

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerNárodný inštitút vzdelávania a mládeže
TypeWorks
Estimated value621.474 €
Published21 September 2026
CategoryConstruction work · CPV 45331100

Who has won here before

CompanyAwardsPeriod
Events4you SK, s.r.o.12024
BSP Sizar, s. r. o.12024
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Wednesday 7 October at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ÚVO / EVO. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →