Kohta-Järve, Ahtme Nr 50:(Kohtla-Järve) F1 nõuetekohasus (IP9649, IP9647, IP9648, IP9645, IP9643, IP9714, IP9642, IP9644, IP9646)
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 15 October at 09:00 — 7 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to E-Service Aktsiaselts.n = 19
- 24% of the bids received came from other countries (412 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 412
- 57% of this buyer's awards went to companies that had already won here before (575 awards since 2018, spread over 96 companies). 43% went to new names.n = 575 awards since 2018
- 18% of awards went to companies from abroad (575 awards with a known winner country). Sector average: 5%.n = 575
- The median procedure drew 5 bids (514 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 514
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/10/2026.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 777 recorded awards) — mostly from Finland, France, Sweden.
Typical field: median 4 (from 19 awards).
What the buyer is looking for
The call for tenders has been launched: Kohta-Järve, Ahtme Nr. 50: (Place-Järve) F1 conformity (IP9649, IP9647, IP9648, IP9645, IP9643, IP9714, IP9642, IP9644, IP9646) Build according to repair designs and additional terms of the procurement. The deadline for performing the works is 29.12.2026. If possible and necessary, the contract and the execution of the works may start before the estimated start date of the contract published in the general information on the procurement. If the duration of the procurement procedure extends beyond that period, the contract may be concluded and performance of the contract may commence even after the estimated starting date of the contract published in the general data. N.B.: Please pay attention to the document ‘Standard terms and conditions of the contract for the provision of services for the construction of electrical installation P135’, which entered into force on 18 June 2024. 23". / Grounds for exclusion and selection criteria: See the tender specifications
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Silva Service OÜ | 22 | 2024–2026 |
| ESB-MVS OÜ | 18 | 2024–2026 |
| Aktsiaselts Onninen | 18 | 2025–2026 |
| Eltech Solutions OÜ | 18 | 2024–2026 |
| Estwood OÜ | 14 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.