Sopi-Tootsi tuulepargi kolmanda osapoole turbiinide ülevaatus
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 14 October at 11:00 — 10 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 100% of the bids received came from other countries (10 procedures with a bid mix) — all bidders, not just the winners. Sector: 16%.n = 10
- 56% of awards went to companies from abroad (25 awards with a known winner country). Sector average: 11%.n = 25
- The median procedure drew 2 bids (11 procedures with a bid count); 27% ended with a single bidder. Sector: median 7 bids.n = 11
- 33% of this buyer's awards went to companies that had already won here before (25 awards since 2020, spread over 8 companies). That is well below the sector norm (49%) — this buyer switches suppliers more often than others.n = 25 awards since 2020
- 93% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 100%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Estonia · Architecture & engineering, 50 contracts went to foreign companies over the last 3 years (of 1,119 recorded awards) — mostly from Finland, Germany, Poland.
Typical field: median 7 (from 1,123 awards).
What the buyer is looking for
The volume of work includes independent technical inspection of at least thirteen (13) turbines by a third party. The purpose of inspections is to assess the technical condition of the main construction, mechanical, hydraulic, electrical and safety systems of wind turbines, to identify deficiencies, to assess the condition of assets and to support maintenance and investment planning. The customer has the right, but not the obligation, to order inspections of additional wind turbines if there are sufficient budgetary resources and the weather conditions are suitable. / Grounds for exclusion and selection criteria: See the tender specifications
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| 3D Wind Service Oy | 7 | 2025–2026 |
| Enercon GmbH · Riesa | 3 | 2024–2026 |
| GE Vernova International LLC Eesti filiaal | 1 | 2025 |
| Nordex Energy SE & CO. KG | 1 | 2025 |
| Lääne Teed OÜ | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.