Saare County, Saaremaa Municipality, Orissaare-Saikla Ferry Reconstruction (IP7591)
Saare maakond, Saaremaa vald, Orissaare-Saikla fiidri rekonstrueerimine (IP7591)
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 22 October at 08:00 — 14 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to E-Service Aktsiaselts.n = 19
- 24% of the bids received came from other countries (412 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 412
- 57% of this buyer's awards went to companies that had already won here before (575 awards since 2018, spread over 96 companies). 43% went to new names.n = 575 awards since 2018
- 18% of awards went to companies from abroad (575 awards with a known winner country). Sector average: 5%.n = 575
- The median procedure drew 5 bids (514 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 514
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/10/2026.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 777 recorded awards) — mostly from Finland, France, Sweden.
Typical field: median 4 (from 19 awards).
What the buyer is looking for
The call for tenders has been launched: Saare County, Saaremaa Parish, Reconstruction of Orissaare-Saikla Guild (IP7591). Build according to additional conditions and design: KP underground cable line 2.63km, BLL overhead line 3.26km, assembly substation installation -2pcs, dismantling KP overhead line - 2.58km. Deadline for performance of works 30.07.2027. NB! Attention to the tender description file and work volume table! Activation of works performed on the basis of the contract is permitted as of the beginning of 2027, unless the parties have agreed otherwise in writing. Complete substations (available at Tristock warehouse in Keila), distribution transformer, meters, 3x120 KP underground cable and BLL-99 coated cable (the exact delivery time of the cables is unknown, but is expected to be January 2027) will be procured by Elektrilevi, the provider of the rest of the material.…
Show full description
… Transportation of equipment and materials procured by the contracting authority and related costs from the supplier partner of the contracting authority to the object belong to the volume of work of the tenderer. / Grounds for exclusion and selection criteria: See the tender specifications
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Silva Service OÜ | 22 | 2024–2026 |
| ESB-MVS OÜ | 18 | 2024–2026 |
| Aktsiaselts Onninen | 18 | 2025–2026 |
| Eltech Solutions OÜ | 18 | 2024–2026 |
| Estwood OÜ | 14 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.