Design of technical systems reconstruction at Pikk tn 20
Pikk tn 20 tehnosüsteemide rekonstrueerimise projekteerimine
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 16 October at 09:00 — 13 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (17 awards since 2024, spread over 17 companies). That is well below the sector norm (49%) — this buyer switches suppliers more often than others.n = 17 awards since 2024
- The median procedure drew 11 bids (17 procedures with a bid count); 0% ended with a single bidder. Sector: median 7 bids.n = 17
- Not one of the 17 awards with a known winner country has gone to a foreign company so far. Sector average: 11%.n = 17
- 100% of the bids received came from small and medium-sized enterprises (17 procedures with a bid mix). Sector: 100%.n = 17
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Estonia · Architecture & engineering, 50 contracts went to foreign companies over the last 3 years (of 1,119 recorded awards) — mostly from Finland, Germany, Poland.
Typical field: median 11 (from 12 awards).
What the buyer is looking for
The object of the public procurement is the preparation of the building design documentation for the reconstruction of the technical systems of the Pikk St. 20 building, including the preliminary and main design documentation to the extent set out in the technical specifications, the application for a building permit, the organisation of all the studies, expert assessments, surveys, analyses and approvals necessary for the performance of design work, the advising of the contracting authority in the conduct of construction procurements and the performance of author's supervision by the designer in the performance of construction work in accordance with the conditions set out in the procurement documents. / Grounds for exclusion and selection criteria: See procurement documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Projektibüroo OÜ | 1 | 2024 |
| Häk OÜ | 1 | 2025 |
| OÜ kiri ja pilt | 1 | 2025 |
| KAVAKAVA OÜ | 1 | 2026 |
| Inseneribüroo Telora OÜ | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.