Tootmishoone nr 3 laiendamine (lao- ja komplekteerimispind) – ehitustööd Lao tn 24, Põlva linn
Estonia · Põlva vald · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 16 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 762 recorded awards) — mostly from Finland, France, Sweden.
Typical field: median 5 (from 566 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Hanke esemeks on Lao tn 24 kinnistul asuva tootmishoone nr 3 laiendamine kahe eraldi hallina teljemõõtmetega 14,0 × 36,0 m ja 14,0 × 39,0 m, kokku ligikaudu 1 060 m² lao- ja komplekteerimispinda. Töövõtt hõlmab ettevalmistus- ja lammutustöid, hoonealust süvendit, vundamente ja aluspõrandaid, teraskarkassi, sandwich-paneelidest välisseinu ja katuslagesid, avatäiteid ja katusetarindeid, tuletõkkekardinaid ning tööjooniste ja tootejooniste koostamist. Töövõtu mahtu ei kuulu kütte- ja ventilatsioonisüsteemid, elektri tugev- ja nõrkvoolupaigaldis koos automaatse tulekahjusignalisatsiooniga, päikesepaneelid ega peakaabli vahetus liitumispunkti ja hoone peakilbi vahel — need hangitakse eraldi. Alusdokumentides on esitatud arhitektuurne põhiprojekt, konstruktsioonide osa tööprojekt ja kohustuslik hinnapakkumuse vorm. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest