Harju maakond, Jägala võrgupiirkonna üleviimine 20kV, III etapp (IP7218)
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 7 October at 10:00 — 18 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to Enersense Aktsiaselts.n = 19
- 24% of the bids received came from other countries (392 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 392
- 55% of this buyer's awards went to companies that had already won here before (554 awards since 2018, spread over 95 companies). 45% went to new names.n = 554 awards since 2018
- 19% of awards went to companies from abroad (554 awards with a known winner country). Sector average: 4%.n = 554
- The median procedure drew 6 bids (494 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 494
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 762 recorded awards) — mostly from Finland, France, Sweden.
Typical field: median 4 (from 19 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Harju maakonnas Jägala võrgupiirkonna üleviimine 10kV-lt 20kV-le, III etapp. Ehitada vastavalt projektile ja lisatingimustele. Enne pakkumiste esitamist tutvuda projektdokumentatsiooniga ning käia kohapeal. Tööde teostamise tähtaeg 28.10.2027. NB: Lepingu alusel teostatud tööde akteerimine on lubatud alates 2027. aasta algusest, kui lepingu pooled ei ole kirjalikult kokku leppinud teisiti. Alajaamad, trafod, keskpingekaabel 240mm2 ja arvestid hangib Elektrilevi ja annab töövõtjale paigaldamiseks üle. Elektrilevi poolt hangitavate seadmete ja materjalide transport ning sellega kaasnevad kulud Elektrilevi tarnepartnerilt objektile kuuluvad töövõtja töö mahtu. Hankija võib hankelepingu sõlmida enne või peale üldandmetes avaldatud lepingu kestuse eeldatavat alguskuupäeva. Lepingu täitmise tähtaeg sellest ei muutu. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Silva Service OÜ | 22 | 2024–2026 |
| ESB-MVS OÜ | 18 | 2024–2026 |
| Eltech Solutions OÜ | 17 | 2024–2026 |
| Estwood OÜ | 14 | 2024–2025 |
| RT Plaan OÜ | 14 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.