Viljandi County, Viljandi City, Järve Street 10 connection to medium voltage (LC5281, IP9502)
Viljandi maakond, Viljandi linn, Järve tn 10 liitumine keskpingel (LC5281, IP9502)
Estonia · how to bid here →
Your path to submission
- Deadline: 25 September at 08:00 — 7 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to Enersense Aktsiaselts.n = 19
- 24% of the bids received came from other countries (392 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 392
- 55% of this buyer's awards went to companies that had already won here before (554 awards since 2018, spread over 95 companies). 45% went to new names.n = 554 awards since 2018
- 19% of awards went to companies from abroad (554 awards with a known winner country). Sector average: 4%.n = 554
- The median procedure drew 6 bids (494 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 494
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 762 recorded awards) — mostly from Finland, France, Italy.
Typical field: median 4 (from 19 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Hange on välja kuulutatud: Viljandi maakond, Viljandi linn, Järve tn 10 liitumine keskpingel (LC5281, IP9502). Ehitada vastavalt projektile ja lisatingimustele. Tööde teostamise lõpptähtaeg on 05.02.2027. - Arvestada, et projektis toodud AJ10297 800 kVA trafo on asendatud 1000 kVA trafoga; - KPS tarne detsember 2026; - 250 kVA trafo saadaval Tristock Keila laos. Võimalusel ja vajadusel võib lepingu sõlmida ja tööde teostamise/teenuste tellimisega alustada enne hanke kohta üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. Hankemenetluse kulgemise pikenemisel üle selle aja võib lepingu sõlmida ja selle täitmisega alustada ka peale üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Silva Service OÜ | 22 | 2024–2026 |
| ESB-MVS OÜ | 18 | 2024–2026 |
| Eltech Solutions OÜ | 17 | 2024–2026 |
| Estwood OÜ | 14 | 2024–2025 |
| RT Plaan OÜ | 14 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.