Rapla County, Märjamaa Municipality, Jõeääre Village, Replacement of Jõeääre Substation with a New One (IP7766)
Rapla maakond, Märjamaa vald, Jõeääre küla, Jõeääre alajaama asendus uuega (IP7766)
Estonia · how to bid here →
Your path to submission
- Deadline: 30 September at 06:00 — 12 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to Enersense Aktsiaselts.n = 19
- 24% of the bids received came from other countries (392 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 392
- 55% of this buyer's awards went to companies that had already won here before (554 awards since 2018, spread over 95 companies). 45% went to new names.n = 554 awards since 2018
- 19% of awards went to companies from abroad (554 awards with a known winner country). Sector average: 4%.n = 554
- The median procedure drew 6 bids (494 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 494
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 762 recorded awards) — mostly from Finland, France, Italy.
Typical field: median 4 (from 19 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Hange on välja kuulutatud: Rapla maakond, Märjamaa vald, Jõeääre küla, Jõeääre alajaama asendus uuega (IP7766) Ehitada vastavalt projektile ja hanke lisatingimustele. Tööde teostamise tähtaeg on 30.11.2026. Võimalusel ja vajadusel võib lepingu sõlmida ja tööde teostamisega alustada enne hanke kohta üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. Hankemenetluse kulgemise pikenemisel üle selle aja võib lepingu sõlmida ja selle täitmisega alustada ka peale üldandmetes avaldatud lepingu kehtivuse eeldatavat algusaega. NB! Palume tähelepanu pöörata 18.06.2024 kehtima hakanud dokumendile „P135 Elektripaigaldise ehitustööde töövõtulepingu tüüptingimused ver. 23". / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Silva Service OÜ | 22 | 2024–2026 |
| ESB-MVS OÜ | 18 | 2024–2026 |
| Eltech Solutions OÜ | 17 | 2024–2026 |
| Estwood OÜ | 14 | 2024–2025 |
| RT Plaan OÜ | 14 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.