Purchase of electric buses and gas buses
Elektribusside ja gaasibusside ostmine
Estonia · Tallinn · how to bid here →
Your path to submission
- Deadline: 16 October at 09:00 — 12 days left.
- You submit on Riigihangete register — not here and not by e-mail. ↗
- Offer and evidence in: EST, EST.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 100% of the bids received came from other countries (55 procedures with a bid mix) — all bidders, not just the winners. Sector: 44%.n = 55
- In this sector the buyer awards roughly every month (15 awards, most recently March 2025) — by that rhythm the next award was due around April 2025. The last award went to Aktsiaselts SEB Liising.n = 15
- 30% of this buyer's awards went to companies that had already won here before (55 awards since 2024, spread over 39 companies). That is well below the sector norm (56%) — this buyer switches suppliers more often than others.n = 55 awards since 2024
- The median procedure drew 2 bids (55 procedures with a bid count); 35% ended with a single bidder. Sector: median 2 bids.n = 55
- 95% of the bids received came from small and medium-sized enterprises (55 procedures with a bid mix). Sector: 85%.n = 55
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Estonia · Transport equipment, 40 contracts went to foreign companies over the last 3 years (of 848 recorded awards) — mostly from Germany, Finland, Poland.
Typical field: median 2 (from 15 awards).
What the buyer is looking for
The purpose of the public procurement is the purchase of electric buses and gas buses. The public procurement is divided into two lots, where the framework contract and the first-order contract are awarded in each lot to one tenderer as follows: 1) In lot 1, a framework contract will be concluded for the purchase of M3 class II electric buses (including warranty repairs, training and fulfilment of all public procurement conditions) for a maximum of 10 electric buses, while the first public contract will be concluded for the purchase of 5 electric buses. 2) In lot 2, a framework contract is concluded for the purchase of M3 Class II gas buses (with warranty repair, training and fulfilment of all the conditions of the public procurement) for a maximum of 30 gas buses, whereas the conclusion of the framework contract is the first contract for the purchase of 9 gas buses. / Grounds for exclusion and selection criteria: See procurement documents
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Estonian.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Institute of Food Safety, Animal Health and Environment "BIOR" | 6 | 2025–2026 |
| KPMG Baltics OÜ | 3 | 2024–2025 |
| Aktsiaselts SEB Liising | 3 | 2024–2025 |
| Maaelu Edendamise Sihtasutus | 3 | 2025 |
| Aktsiaselts Linnamäe Lihatööstus | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.