Construction of lighting for pedestrian and bicycle path including earthworks and cabling as part of the task: Construction of pedestrian-bicycle path along DP no. 1517 O in Niemodlin, 700-lecia Street.
Budowa oświetlenia drogi dla pieszych i rowerów w zakresie robót ziemnych i okablowania w ramach zadania pn. Budowa ciągu pieszo-rowerowego w ciągu DP nr 1517 O w m. Niemodlin ul. 700-lecia.
Poland · Niemodlin · how to bid here →
Your path to submission
- Deadline: 28 September at 09:30 — 16 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (24 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to PD TRAKT Sp. z o. o..n = 24
- 12% of this buyer's awards went to companies that had already won here before (35 awards since 2015, spread over 27 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 35 awards since 2015
- The median procedure drew 2 bids (5 procedures with a bid count); 40% ended with a single bidder. Sector: median 5 bids.n = 5
- 3% of awards went to companies from abroad (35 awards with a known winner country). Sector average: 0%.n = 35
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 12/09/2026.
Foreign bidders
In Poland · Construction work, 131 contracts went to foreign companies over the last 3 years (of 190,308 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 5 (from 4,787 awards).
What the buyer is looking for
1. Przedmiotem zamówienia jest budowa oświetlenia drogi dla pieszych i rowerów przy ul. 700-lecia Niemodlina, w tym dostawa i montaż 40 wolnostojących latarni oświetlenia ulicznego z oprawami typu LED.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HUCZ Spółka z ograniczoną odpowiedzialnością, Sp. K | 3 | 2022–2026 |
| DDTHERM Sp. z o. o. | 2 | 2021 |
| S.A.M. Marcin Balcarz | 2 | 2024–2025 |
| Zakład Budownictwa Ogólnego DROBUD Sp. z o.o. | 2 | 2023–2025 |
| FHU Horyzont Krzysztof Lech | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.