Metalwork
Metallbauarbeiten
Germany · how to bid here →
Your path to submission
- Deadline: 3 November at 12:00 — 31 days left.
- You submit on HAD — Hessische Ausschreibungsdatenbank — not here and not by e-mail. ↗ Free bidder account on the state platform required; electronic submission, usually plain text form. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Germany, 5,912 contracts went to foreign companies over the last 3 years (of 715,406 recorded awards) — mostly from Austria, Poland, Italy.
What the buyer is looking for
Metal construction work - General - Demolition work Pipe frame doors, interior - Sheet steel doors, interior and exterior - Pipe frame doors, interior and exterior - Facade elements, windows and glazing - Maintenance - Railings, interior and exterior, bridge exterior Metal construction work Julius-Leber-Schule, Vocational School of Economics, Administration and Health at Seilerstraße 32 in 60313 Frankfurt am Main will be renovated and rebuilt from the beginning of summer holidays 2026 until the beginning of summer holidays 2029. The construction is carried out in 1 construction phase, the school building is vacated, the sports operation in the sports hall is discontinued during the construction phase. Scope of services Metal construction work: Sheet steel doors, inside and outside - T0-1, steel frame, 1,135/2,135 m, 1 pc. - T0-1, square steel frame, Uw <1.8 W/m2K, approx. 0.89/2.05 m,…
Show full description
… approx. 6 pcs - T30-1, square steel frame, various standard and special sizes, e.g. 1.05/2.03 m, approx. 11 pcs. - T30/RS-1, square steel frame, various standard and special sizes, e.g. 1.01/2.01 m, approx. 17 pcs. - T30/RS-2, steel sports hall Z, doors 1-sided with clothing bounce protection, approx. 2.01/2.28 m, 2 pcs. - T90-1, square steel frame, 0,885/2,00 m, 1 pc. Tubular frame doors, inside and outside - T0-2, steel, with fall pattern TRB apron, approx. 2.03/2.99 m, 1 pc - RS/FL-2, steel, without or with 2 side parts with and without skylight, approx. - RS/OF-1, with side panel, approx. 2,00/2,28 m, 1 pc. - T0-1, steel, Uw <1,3 W/m2K, RC3, approx. 1,51/2,25 m, 1 pc tubular frame doors, listed, inside and outside - T0-Pendel-2, steel, 2,25/2,25 m, 1 pc. - T0-2, steel, Uw <1,3 W/m2K, approx. - T0-1, steel, with 2 side panels, skylight and TRB apron, approx. 3.00/3.87 m, 1 pc. - T0-2, steel, with 2 side panels & skylight, approx. 2.75/2.45 m, 5 pcs. - T30/RS/OF-2, steel, with skylight, approx. 2.35/3.65 m, 3 pcs. - T30/RS/OF-2, steel, with 2 side panels & skylight, approx. 2,97/3,00 m, approx. - T30/RS/FL-1, steel, approx. 1,135/2,135 m, 1 pc. - T30/RS/OF-2, steel,
Contract
How to bid
11-16696