Friedrich & ClementBETA

INSTALLATION OF 99 KW POWER PHOTOVOLTAIC ENERGY GENERATION SYSTEM IN PALLOI, N. NISYROS

ΕΓΚΑΤΑΣΤΑΣΗ Φ/Β ΣΥΣΤΗΜΑΤΟΣ ΠΑΡΑΓΩΓΗΣ ΕΝΕΡΓΕΙΑΣ ΙΣΧΥΟΣ 99 KW ΣΤΟΥΣ ΠΑΛΛΟΥΣ Ν. ΝΙΣΥΡΟΥ

Greece · how to bid here →

Your path to submission

  1. Deadline: 27 October at 13:00 — 24 days left.
  2. You submit on ΚΗΜΔΗΣ / ΕΣΗΔΗΣ — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (58 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to ΜΑΥΡΟΝΙΚΟΛΑΣ ΧΑΡΑΛΑΜΠΟΣ.n = 58
  • 59% of this buyer's awards went to companies that had already won here before (2,114 awards since 2022, spread over 855 companies). 41% went to new names.n = 2,114 awards since 2022
  • The award came in at a median 98% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 90%.n = 7
  • The median procedure drew just one bid (757 procedures with a bid count); 77% ended with a single bidder. Sector: median 1 bids.n = 757
  • 3% of awards went to companies from abroad (2,114 awards with a known winner country). Sector average: 0%.n = 2,114

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.

Clement
When comparable contracts were last awarded here, usually just a single offer was on the table — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Greece · Construction work, 126 contracts went to foreign companies over the last 3 years (of 53,280 recorded awards) — mostly from Italy, Germany, Albania.

Typical field: median 1 (from 15 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Installation of a PV power generation system with a capacity of 99 kW in the water supply tanks in Palous to meet the energy needs of desalination in the prefecture of Nisyros

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerΠΕΡΙΦΕΡΕΙΑ ΝΟΤΙΟΥ ΑΙΓΑΙΟΥ
TypeWorks
Estimated value60.000 €
Published30 September 2026
CategoryConstruction work · CPV 45315600-4

Who has won here before

CompanyAwardsPeriod
ΣΚΕΥΟΣ ΜΟΥΓΚΡΟΣ402024–2026
COBEL ABEE332024–2026
ΓΙΜΟΥΚΗΣ ΑΝΑΣΤΑΣΙΟΣ252024–2026
ΚΟΙΝΟΠΡΑΞΙΑΣ ΔΩΔΕΚΑΝΗΣΟΣ ΘΑΛΑΣΣΙΕΣ ΓΡΑΜΜΕΣ232024–2026
ΒΑΣΙΛΕΙΟΣ ΚΟΖΑΣ ΚΑΙ ΣΙΑ ΟΕ202024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20221
20231
202448
202546
202626

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 27 October at 13:00

How to bid

Open ΚΗΜΔΗΣ / ΕΣΗΔΗΣ and search there for:
26PROC019887337
The notice carries this number on the portal. If the search finds nothing, try the title or the buyer.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →