Mikkelin kaupungin virastotalon aurinkosähköjärjestelmä
Finland · Mikkeli · how to bid here →
Your path to submission
- Deadline: 26 October at 10:00 — 22 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 26% of this buyer's awards went to companies that had already won here before (97 awards since 2018, spread over 59 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 97 awards since 2018
- The award came in at a median 108% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 91%.n = 6
- The median procedure drew 4 bids (75 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 75
- 5% of awards went to companies from abroad (97 awards with a known winner country). Sector average: 2%.n = 97
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).
Typical field: median 4 (from 3,506 awards).
What the buyer is looking for
The solar photovoltaic system of the City of Mikkeli's office building The City of Mikkeli's Building Services will request your offer for the solar photovoltaic system of the City's office building on a turnkey basis, in accordance with this invitation to tender. The address is Maaherrankatu 9-11, 50100 Mikkeli. The Agency building is operational and operated in accordance with safety instructions, taking into account e.g. the safety and needs of users. Renovation is carried out at the northern end of the building. An on-grid photovoltaic system with a minimum panel power of 150kWp will be built on the roof of the building. The roof material of the building is bitumen cream and the roof is flat roof. More detailed information on the requirements in the work programme. The contract is a Kvr contract. Time taken to complete the work: Start work as soon as the contract is signed. Works to…
Show full description
… be received on 31.12.2026. The implementation schedule will be specified in negotiations with the contractor. Contact person of the developer: Energy Engineer Erkka Kanerva, tel. 0404821322. Access to the building site: The developer requires that the contractor has acquainted himself with the work site before making an offer. Even on his own initiative, the contractor loses the right to rely, at a later stage, on factors which could have been discernible by a careful examination of the subject-matter. An excursion to the site, which is optional, will take place on Friday, 9 October 2026, at 12:00 noon. Registration: 8 October 2026 at 12:00. Erkka Kanervalle, tel. +358 0404821322, [email protected],
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Viherpalvelut Hyvönen Oy | 6 | 2020 |
| Tilausliikenne Himanen Oy | 5 | 2018–2025 |
| Lindström Oy | 2 | 2021 |
| OP Yrityspankki Oyj | 2 | 2021 |
| If Vahinkovakuutus Oyj, Suomen sivuliike · ESBO | 2 | 2021 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.