Sähkösuunnittelu, puitesopimuskilpailutus 2027-2028 ja optiot vuosille 2029 ja 2030
Finland · Jyväskylä · how to bid here →
Your path to submission
- Deadline: 8 November at 21:59 — 36 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (71 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to WSP Finland Oy.n = 71
- The median procedure drew 5 bids (399 procedures with a bid count); 10% ended with a single bidder. Sector: median 8 bids.n = 399
- 28% of this buyer's awards went to companies that had already won here before (633 awards since 2018, spread over 367 companies). 72% went to new names.n = 633 awards since 2018
- The award came in at a median 80% of the estimated value (16 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 16
- 3% of awards went to companies from abroad (633 awards with a known winner country). Sector average: 1%.n = 633
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Finland · Architecture & engineering, 33 contracts went to foreign companies over the last 3 years (of 5,131 recorded awards) — mostly from Sweden, Poland, Italy.
Typical field: median 5 (from 47 awards).
What the buyer is looking for
Electrical design, framework contract tendering 2027-2028 and options for the years 2029 and 2030 The City of Jyväskylä (Status service enterprise and all industries), Jyväskylä University of Applied Sciences Ltd (JAMK), Kiinteistö Oy Tikkakoski Terveysasema, Kiinteistö Oy Jyväskylän Lääkäritalo form the procurement ring and the electrical design tasks to be tendered in accordance with the call for tenders for the framework agreement and its annexes for the years 2027 and 2028, as well as options for the years 2029 and 2030. 4 (four) contract partners will be selected. The estimated value of the procurement for the contract period is EUR 800 000. The maximum value of the procurement for the contract period is EUR 1 000 000. The maximum value includes a provision for procurement needs that are difficult to estimate in advance during the contract period and the extent of which cannot be…
Show full description
… reliably estimated at the start of the procurement. The maximum value does not reflect the contracting entity's commitment to the procurement volume, but the maximum possible value of the procurement during the contract period. If the maximum value has been reached before the expiry date of the fixed-term contract or any option period introduced, the framework agreement shall terminate. In this case, the Supplier shall have no claims against the Customer.,
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Ilveslahden Siivous Oy | 8 | 2021–2024 |
| Keski-Suomen Ilmastointihuolto Oy | 8 | 2019–2025 |
| Are Oy | 7 | 2019–2025 |
| ESP Suomi Oy | 7 | 2019–2025 |
| A-Insinöörit Suunnittelu Oy (0211382-6)//Delete Finland Oy (1075521-2)//Inspecta Oy (1787853-0)//RKM Group Oy (1892257-2)//Sitowise Oy (2335445-0)//Sweco Asiantuntijapalvelut Oy (2635440-5)//WSP Finland Oy | 5 | 2020–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.