EMRC Showroom Lahti, AV Procurement
EMRC Showroom Lahti, AV-hankinta
Finland · Lappeenranta · how to bid here →
Your path to submission
- Deadline: 5 October at 09:00 — 2 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 27% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 2%.n = 15
- 29% of this buyer's awards went to companies that had already won here before (15 awards since 2019, spread over 9 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 15 awards since 2019
- The median procedure drew 2 bids (11 procedures with a bid count); 45% ended with a single bidder. Sector: median 3 bids.n = 11
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Finland · Radio, TV & communications, 7 contracts went to foreign companies over the last 3 years (of 417 recorded awards).
Typical field: median 3 (from 310 awards).
What the buyer is looking for
EMRC Showroom Lahti, AV-acquisition LUT University will build an exhibition space on the Lahti campus by the end of January 2027. New equipment will be used in the procurement. The procurement includes making the equipment and systems fully operational. The equipment purchased must be products from trusted manufacturers for professional use. Upon installation, all devices in the system should be updated with the latest software / firmware. The customer requires that the installer used by the supplier has appropriate training (e.g. training provided by the manufacturer) for the installation and configuration of the systems. Qualifications must be maintained on request. The IP address area used in the equipment can be obtained from the subscriber. Records of the IP numbers used shall be kept on a device-by-device basis. The system must be installed, configured and commissioned as soon as…
Show full description
… possible or by 15 January 2027 at the latest. More detailed information, requirements and technical specifications concerning the subject of the contract are set out in the annexes to the invitation to tender, in particular in Annex 2 (Design documentation).
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Anton Paar Nordic AB, Suomen sivuliike | 2 | 2026 |
| AMPLITUDE | 2 | 2020–2021 |
| Soletair Power | 2 | 2023 |
| DevinSense AB | 2 | 2026 |
| Finn-Fold Oy | 2 | 2020 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.