Friedrich & ClementBETA

Säterinpuistontie between Leppävaarankatu – Turuntie

Säterinpuistontie välillä Leppävaarankatu – Turuntie

Finland · ESPOON KAUPUNKI · how to bid here →

Your path to submission

  1. Deadline: 26 October at 10:00 — 23 days left.
  2. You submit on Hilma — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (128 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to VRJ Etelä-Suomi Oy.n = 128
  • 23% of this buyer's awards went to companies that had already won here before (1,192 awards since 2014, spread over 789 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 1,192 awards since 2014
  • The median procedure drew 6 bids (911 procedures with a bid count); 7% ended with a single bidder. Sector: median 4 bids.n = 911
  • The award came in at a median 105% of the estimated value (25 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 91%.n = 25
  • 3% of awards went to companies from abroad (1,192 awards with a known winner country). Sector average: 1%.n = 1,192

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).

Typical field: median 11 (from 88 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Säterinpuistontie between Leppävaarankatu and Turuntie Säterinpuistontie between Leppävaarankatu and Turuntie is a new regional assembly street that improves the functionality and safety of traffic in the Leppävaara area. The street forms a new link between Turuntie and Leppävaarankatu by car, bicycle and pedestrian traffic. The street is below the Helsinki-Turku railway line and the Rantaradanbaan, which is planned to be located north of the railway line. The work includes, street and water supply construction work. Work is carried out in railway and street areas, partly in public transport and in park areas. The contract uses the Infrakit project bank, data models and machine control. Attention will also be paid to the emission values of natural stone materials used in the contract.,

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerEspoon kaupunki
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published23 September 2026
CategoryConstruction work · CPV 45200000

Who has won here before

CompanyAwardsPeriod
Wihuri Oy92023–2026
Trimble Solutions Oy72021–2023
Suomen Energia-Urakointi Oy62023–2024
Prorink International AB62018–2026
Granlund Oy52023–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202049
202146
202242
202333
202457
202573
202654

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 26 October at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on Hilma. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →