Arolammin raw wood loading site, general plan
Arolammin raakapuun kuormauspaikka, yleissuunnitelma
Finland · HELSINKI · how to bid here →
Your path to submission
- Deadline: 22 October at 09:00 — 18 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (580 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to AFRY Finland Oy (FI06259056)//FINNMAP Infra Oy (0921976-2)//Sweco Finland Oy (2661738-3)//WSP Finland Oy (0875416-5)//A-Insinöörit Suunnittelu Oy (0211382-6)//Sitowise Oy.n = 580
- 73% of this buyer's awards went to companies that had already won here before (1,942 awards since 2018, spread over 364 companies). That is well above the sector norm (39%) — newcomers have a harder time here than elsewhere.n = 1,942 awards since 2018
- The median procedure drew 4 bids (1,319 procedures with a bid count); 13% ended with a single bidder. Sector: median 8 bids.n = 1,319
- 20% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 54%.n = 9
- The award came in at a median 83% of the estimated value (48 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 48
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Finland · Architecture & engineering, 33 contracts went to foreign companies over the last 3 years (of 5,131 recorded awards) — mostly from Sweden, Poland, Italy.
Typical field: median 4 (from 393 awards).
What the buyer is looking for
General plan for the loading of Arolamm's raw wood The procurement includes the preparation of a general plan for the loading of Arolamm's raw wood. The planning area is located about 3 km south of the Riihimäki traffic station. The planning area is currently agricultural and forestry land. A preliminary study on the loading location of Arolamm raw wood has been prepared. On the basis of the preliminary report, the task is to draw up a general plan for the loading point of Arolamm's raw wood in accordance with the Railway Act. The work also includes carrying out the necessary nature and environmental studies in the planning area. The work also includes the preparation of materials related to the necessary permits. The content of the contract is specified in more detail in the tender documents and in the technical documents available for download via the Sharefile link https://vayla.sharefile.eu/d-s7fabbfd3d6474070918921802396b742,
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Welado Oy · OULU | 72 | 2019–2026 |
| Proxion Plan Oy (FI22615698)//NRC Group Finland Oy | 72 | 2018–2026 |
| GRK Rail Oy | 61 | 2020–2026 |
| Ramboll CM Oy · ESBO | 54 | 2019–2026 |
| Kreate Oy | 54 | 2019–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.