Friedrich & ClementBETA

Renewal of Locks (16 items)

Lukituksen uusiminen (16 kohdetta)

Finland · Jyväskylä · how to bid here →

Your path to submission

  1. Deadline: 20 October at 13:00 — 17 days left.
  2. You submit on Hilma — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (11 awards since 2018, spread over 10 companies). That is well below the sector norm (51%) — this buyer switches suppliers more often than others.n = 11 awards since 2018
  • The median procedure drew 7 bids (10 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 10
  • Not one of the 11 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 11

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Finland · Other services, 2 contracts went to foreign companies over the last 3 years (of 626 recorded awards).

Typical field: median 5 (from 489 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Renewal of locking (16 items) MECHANICAL LICENSE The serialisation covers 16 residential properties. The mechanical locking of objects is renewed with the Abloy Easy system. Cylinders are renewed, old lock bodies and fittings are stored. The contractor is obligated to examine the sites independently before submitting a tender and to ensure that the lock diagrams are up to date. Waste canopies, yard buildings, mailboxes and other locks are part of the contract where they are already locked. The contract also includes lubrication of lock locks and key boxes (operating locks, safety locks, long latches) and tightening of screws. Other necessary repairs will be carried out as additional work if necessary. The contract includes all the work and supplies to achieve the finished result, as well as a new locking diagram. In addition to the new locking diagram, updated layout drawings of the…

Show full description

… common spaces are prepared for the client. Lock diagrams and new keys are delivered to key management points (maintenance company/lock shop). The extent of the locks is in accordance with the old locks with the following remarks: - keys 3 pcs / key types apartment, magazine divider, route, club room, etc. - 7 service keys, of which 1 will be delivered to the KTL1E system key storage - 7 universal keys - all keys will be stamped (identified code) - the reserve available for the lock must be as wide as possible Keys will be delivered to the key management point no later than 14 days (2 weeks) before the agreed installation time starts SERVICE OF TELECOMMUNICATIONS KTL1E In addition, the shared telecommunication facilities of all properties will be serialized in the KTL1E system and the KTL1E system key housing will be installed on the outer wall of the buildings (if there are no empty spaces, drilling into the wall of the key storage pipe will also be included in the contract). Common telecommunication spaces include house-shares, sub-shares, floor-shares and other enclosures and boxes with doors that contain switching points or telecommunication equipment installed in common spaces. KTL1E keyring tube is supplied with 1pcs of maintenance keys for the target. Two key storage keys are delivered with the other keys to the key management point. The subscription fees for the KTL1E system are the responsibility of the subscriber. PRESS RELEASE The releases on the start of the work (per site) will be made in cooperation with the client no later than 3 weeks before the start of the installation work. Residents must have at least 14 days after receiving the information notice to retrieve the keys from the key management point before starting work. The subscriber is responsible for distributing the newsletters. URAKKA TIME The contract period will be agreed separately, however, all installations will be ready by the end of March 2027.,

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerJyväskylän Vuokra-asunnot Oy
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published22 September 2026
CategoryOther services · CPV 98395000

Who has won here before

CompanyAwardsPeriod
Kosken LVI-Palvelu Oy12026
Mikenti Oy12026
Bravida Finland Oy12026
Jari Hämäläinen Oy (Aurinkokodit) (1010588-5)//VaajaSaneerauS Oy (2448641-2)//Feeniks-saneeraus (1917162-7)//Rakennusliike Jyväs-Varma Oy (1968516-9)//Hasek Oy (0487473-3)//Rakennusliike Seiska Oy (0174414-0)//Huoneistoremontit A. Matilainen Oy (2173566-3)//Puiterakennus Oy (2621972-1)//Rakennus ja 12020
Urbaser Oy12026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20231
20261

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 20 October at 13:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on Hilma. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Renewal of Locks (16 items) — Friedrich & Clement