Kellokosken Jokipuisto and municipal stairs
Kellokosken Jokipuisto ja kuntoportaat
Finland · Tuusula · how to bid here →
Your path to submission
- Deadline: 13 October at 09:00 — 10 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (21 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Uudenmaan Pihamestarit Oy.n = 21
- 29% of this buyer's awards went to companies that had already won here before (174 awards since 2017, spread over 96 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 174 awards since 2017
- The median procedure drew 4 bids (115 procedures with a bid count); 7% ended with a single bidder. Sector: median 4 bids.n = 115
- The award came in at a median 91% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 5
- 3% of awards went to companies from abroad (174 awards with a known winner country). Sector average: 1%.n = 174
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).
Typical field: median 5 (from 7 awards).
What the buyer is looking for
Kellokoski River Park and Fitness Stairs The construction site is located in Kellokoski, Tuusula, bordering the park area bordered by the Old Highway, Keravanjoki and Kirvesmiehentie. The construction contract includes the construction of a park and a fitness ladder with materials and work as planned, as well as work according to electricity plans. The contract is a total contract with a total price, in which the selected contractor acts as the main contractor. The contractor draws up a warranty period management plan for the sites, the plan and the execution of the work must be based on the Green Environment Association's publication VKT 2021. The plan will be approved by the Subscriber. The subscriber requires tenderers to familiarise themselves with the site either independently or by attending a demonstration. The client will arrange a guided tour of the work area on Monday 28 September 2026 at 3 pm.,
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| FCG suunnittelu ja tekniiikka Oy | 6 | 2020–2021 |
| Rejlers Finland Oy · MIKKELI | 5 | 2020–2023 |
| Isku Spaces Oy | 4 | 2025–2026 |
| Elisa Oyj · HELSINGFORS | 4 | 2020–2026 |
| Louhintahiekka Oy | 3 | 2018–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.