Friedrich & ClementBETA

Suvilahdenkatu and Vilhonvuorenkatu, overall contract

Suvilahdenkatu ja Vilhonvuorenkatu, kokonaisurakka

Finland · HELSINGIN KAUPUNKI · how to bid here →

Your path to submission

  1. Deadline: 12 October at 10:00 — 9 days left.
  2. You submit on Hilma — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (287 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Louhintahiekka Oy.n = 287
  • 36% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 75%.n = 10
  • 55% of this buyer's awards went to companies that had already won here before (1,452 awards since 2018, spread over 520 companies). 45% went to new names.n = 1,452 awards since 2018
  • The median procedure drew 5 bids (1,093 procedures with a bid count); 8% ended with a single bidder. Sector: median 4 bids.n = 1,093
  • The award came in at a median 93% of the estimated value (92 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 92

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).

Typical field: median 5 (from 185 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Suvilahdenkatu and Vilhonvuorenkatu, total contract The contract comprises the works required for the construction of the Vilhonvuorenkatu and Suvilahdenkatu project to the extent indicated in the contract documents, in accordance with the tender specifications, with all related works and procurements fully completed. The contract includes, among other things, the construction of the streets and water supply on the Hämeentie-Sörnäinen coastal road between Suvilahdenkatu and Vilhonvuorenkatu to the extent indicated in the contract documents. The project also includes work on the connecting areas of Hämeentie, Pääskylänrinne and Pääskylänkatu and Sörnäisten rantatie to the extent required for the connection of structures. The developer is the General Areas service of the City of Helsinki's Urban Environment Division, which also acts as a subscriber in accordance with YSE 98. Milestone 1:…

Show full description

… The connection and paving work of the Sörnäisten rantatie and Vilhonvuorenkatu junctions, excluding 295 water supply and municipal engineering, must be completed and in operable condition by 30 December 2026 at the latest. The works in accordance with the contract documents must be ready and received and the inspections required by the authorities and the inspection bodies must have been satisfactorily held on 29 October 2027. The form of the contract is a total contract in which the contractor selected for the work acts as the main contractor within the meaning of YSE and legislation. On 7 March 2017, the CIS parties entered into a cooperation agreement under the name ‘common municipal engineering site’, in which the City of Helsinki was designated as the ‘main contractor’ and the other contracting parties as the ‘subscribers’. In this agreement, the CIS Parties have agreed, among other things, on the appointment of a joint security coordinator in accordance with VNa 205/2009. From the ‘subscribers’ of the CIS site, all the responsibilities of the principal contractor mentioned in the commercial documents of that contract are transferred to the principal contractor. Section 1.7 of the Works Programme lists the developer's CIS parties, separate contracts and Section 1.8 lists the developer's other procurements. In addition, the procurement limits of the CIS parties are specified in the Works Limits Annex. In addition to the works according to the plans mentioned in the list of documents, the contract includes site management duties and site services, which also apply to the separate contracts in section 3.4 and the separate procurements of the developer and the procurement limits of the CIS parties set out in the Work Limits Annex. The work is carried out as a total price contract. The site will be fully implemented as a low-emission construction site, the requirements of which can be found in the Work Limits Annex. The amounts indicated in the plans are not binding on the subscriber. The contract will be awarded to the tenderer offering the most economically advantageous tender. The most economically advantageous tender shall be the lowest priced tender meeting the tenderer's suitability requirements set by the developer. The subcontractor/subcontractor of the contractor with a contractual relationship with the client has the right to subcontract the work. It is not possible to chain the procurement/contract further than this without a particularly justified reason and the written consent of the client/builder must be obtained.,

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerHelsingin kaupunki, kaupunkiympäristön toimiala
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published21 September 2026
CategoryConstruction work · CPV 45200000

Who has won here before

CompanyAwardsPeriod
Ramboll Finland Oy322022–2026
Linea Konsultit Oy (1639698-6)//Ramboll Finland Oy (0101197-5)//Sitowise Oy · ESBO322020–2026
SITOWISE OY312022–2026
Peab Oy232020–2025
AFRY Finland Oy (0625905-6)//Ramboll Finland Oy222020–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20206
202159
2022105
2023157
2024174
2025221
2026158

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on Hilma. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →
Suvilahdenkatu and Vilhonvuorenkatu, overall contract — Friedrich & Clement