Your path to submission
- Deadline: 26 October at 10:00 — 22 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN, FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (87 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to AFRY Finland Oy (0625905-6)//Spolia Design Oy (3150185-2)//Ramboll Finland Oy (0101197-5)//IdeaStructura Oy.n = 87
- The median procedure drew 5 bids (450 procedures with a bid count); 15% ended with a single bidder. Sector: median 8 bids.n = 450
- 30% of this buyer's awards went to companies that had already won here before (520 awards since 2017, spread over 275 companies). 70% went to new names.n = 520 awards since 2017
- The award came in at a median 95% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 18
- 67% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 54%.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Finland · Architecture & engineering, 33 contracts went to foreign companies over the last 3 years (of 5,131 recorded awards) — mostly from Sweden, Poland, Italy.
Typical field: median 7 (from 82 awards).
What the buyer is looking for
The procurement targets surveys related to contaminated soil, sediments or groundwater, the management of permit processes and the supervision of remediation work for various land use projects in the client's operating environment. The assignments are expert tasks that require professionalism and initiative. As a rule, expert tasks include project preparation, planning, co-ordination of co-operation, preparation of decision-making, presentation and reporting, etc. Depending on the site, the service provider may be granted different operating powers, which are defined on a project-by-project basis. The content of the procurement and the tasks are described in more detail below. The procurement is divided into two parts. It is a framework agreement in which four service providers are selected by sub-area, provided that at least four/sub-areas of accepted tenders are received. The duration…
Show full description
… of the framework agreement shall be two years and may be extended by a two-year option period. Please refer to the draft contract for a more detailed description of the operating model of the contract period and the framework agreement. In addition to the City of Tampere, the customer is Tampereen Vesi Oy. , Tasks related to the exploration and remediation of contaminated sites The terms of reference of a framework agreement may include the following tasks and combinations thereof. - Exploratory work on a designated design or construction area to identify and assess the extent, degree and need of pollution remediation and to prepare a site-specific risk assessment. - Identification, demonstration and selection of the most suitable and cost-effective cleaning method for each site, minimising the required mass changes. - Preparation of environmental permit applications and/or notifications required for the treatment of contaminated soil. - Drawing up the plans for the remediation of contaminated soil and the documentation required for the remediation calculations, and acting as the environmental technical supervisor of the remediation. - Preparation of reports and summaries related to the transfer of land in relation to the cleanliness of the soil of the property. - Ensuring compliance with environmental protection legislation, waste regulations and environmental management guidelines. - Organisation of sampling and surveys using standardised or equivalent reliable methods. - Exploring the use of circular economy materials in earthworks. - Other clearing tasks and parallel reviews agreed on a case-by-case basis. - Comparison and suitability assessments of in-situ techniques for decontaminated soils. The terms of reference of a framework agreement may include the following tasks and combinations thereof. - Preparation of permit application documents for water management permits - Sampling of sediment studies and risk assessments in inland waterways and normalisation and reporting of results - Flow modelling - Dredging planning and drafting of works documentation The list is not exhaustive and may also include, as a sub-stage, expert tasks in other sectors. These tasks are negligible in relation to the main task of the mandate. Minority means that they would not constitute an independent set of assignments., Tasks related to landfill structures and construction of contaminated sites and landfills The assignments of a framework agreement may include the following tasks and combinations of these. -Design works for landfill structures related to the closure of old landfills. - Other contaminated sites for which environmental protection structures are planned - Independent quality control during the construction of landfill structures - Construction of a remediation project for a contaminated site - Preparation of contract documents for a remediation project for a contaminated site or landfill The list is not exhaustive and may also include, as a sub-stage, expert tasks in other industries. These tasks are negligible in relation to the main task of the mandate. Insufficient means that they would not form an independent whole
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Tammenlehväkeskus Oy | 8 | 2019–2022 |
| Ramboll Finland Oy | 7 | 2025–2026 |
| rkk Bear Group Oy | 7 | 2023–2026 |
| SITOWISE OY | 6 | 2024–2026 |
| Triplan Oy · HÄMEENLINNA | 6 | 2023–2026 |
How often this buyer tenders this