Tie- ja katuvalaistuksen uusiminen EU-säädösten mukaiseksi, led-valaisinten hankinta
Finland · Kirkkonummi · how to bid here →
Your path to submission
- Deadline: 12 October at 11:00 — 23 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (294 awards since 2017, spread over 181 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 294 awards since 2017
- The median procedure drew 4 bids (106 procedures with a bid count); 18% ended with a single bidder. Sector: median 3 bids.n = 106
- The award came in at a median 75% of the estimated value (11 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 11
- 5% of awards went to companies from abroad (294 awards with a known winner country). Sector average: 1%.n = 294
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 16/09/2026.
Foreign bidders
In Finland · Electrical machinery, 5 contracts went to foreign companies over the last 3 years (of 476 recorded awards).
Typical field: median 3 (from 285 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Tie- ja katuvalaistuksen uusiminen EU-säädösten mukaiseksi, led-valaisinten hankinta Kirkkonummen kunta uusii vanhoja monimetallivalaisimia led- valaisimiksi ja vuoden 2026 määrä on 1400 kappaletta.,
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Linea Konsultit Oy (1639698-6)//Ramboll Finland Oy (0101197-5)//Sitowise Oy · ESBO | 3 | 2020–2025 |
| VM Suomalainen Oy | 3 | 2023–2024 |
| Louhintahiekka Oy | 3 | 2024–2026 |
| A-Insinöörit Suunnittelu Oy | 3 | 2026 |
| Muuttopalvelu Forsman Oy | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.