Likaisen pyykin säkkirata
Finland · Tampere · how to bid here →
Your path to submission
- Deadline: 5 October at 13:00 — 16 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (27 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to Konecranes Finland Oy.n = 27
- 25% of this buyer's awards went to companies that had already won here before (1,256 awards since 2017, spread over 491 companies). 75% went to new names.n = 1,256 awards since 2017
- The median procedure drew 2 bids (497 procedures with a bid count); 28% ended with a single bidder. Sector: median 3 bids.n = 497
- 7% of awards went to companies from abroad (1,256 awards with a known winner country). Sector average: 2%.n = 1,256
- The award came in at a median 99% of the estimated value (70 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 70
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Finland · Industrial machinery, 13 contracts went to foreign companies over the last 3 years (of 585 recorded awards).
Typical field: median 2 (from 13 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Likaisen pyykin säkkirata Puolustusvoimien logistiikkalaitos hankkii Puolustusvoimien vaatetuskorjaamon Mikkelin tuotantolaitokselle kattoon asennettavan likapyykin säkkiradan. Hankinta kokonaisuus sisältää: - kattoon asennettavan likaisen pyykin säkkiradan suunnittelun, - rakentamisen ja paikalleen toimintakuntoon asentamisen, sekä - vanhan säkkiradan purkamisen ja asianmukaisen kierrättämisen. Hankinnalle on asetettu aikataulutavoitteeksi, että uusi säkkirata olisi toimintavalmiina toukokuussa 2027.,
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bittium Wireless Oy · OULU | 16 | 2020–2025 |
| Nokian Metallirakenne Oy | 10 | 2021–2025 |
| Telia Cygate Oy | 10 | 2021–2025 |
| KEYSIGHT TECHNOLOGIES FINLAND OY | 9 | 2020–2026 |
| Conlog Oy | 8 | 2020–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.