VESISTÖHYBRIDIVALOKUITUKAAPELIEN HANKINTA
Finland · Tampere · how to bid here →
Your path to submission
- Deadline: 30 September at 13:00 — 11 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (54 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Ocotec Oy.n = 54
- 25% of this buyer's awards went to companies that had already won here before (1,256 awards since 2017, spread over 491 companies). 75% went to new names.n = 1,256 awards since 2017
- The median procedure drew 2 bids (497 procedures with a bid count); 28% ended with a single bidder. Sector: median 3 bids.n = 497
- 7% of awards went to companies from abroad (1,256 awards with a known winner country). Sector average: 2%.n = 1,256
- The award came in at a median 99% of the estimated value (70 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 70
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Finland · Radio, TV & communications, 7 contracts went to foreign companies over the last 3 years (of 416 recorded awards).
Typical field: median 2 (from 29 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
VESISTÖHYBRIDIVALOKUITUKAAPELIEN HANKINTA Hankinnan kohteena on vesistöhybridivalokuitukaapelin hankinta teknisen eritelmän mukaisesti (liite 1). Hankittava määrä vuonna 2026 on 400 kilometriä (200 km ja 200 km).,
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bittium Wireless Oy · OULU | 16 | 2020–2025 |
| Nokian Metallirakenne Oy | 10 | 2021–2025 |
| Telia Cygate Oy | 10 | 2021–2025 |
| KEYSIGHT TECHNOLOGIES FINLAND OY | 9 | 2020–2026 |
| Conlog Oy | 8 | 2020–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.