Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
Finland · OULU · how to bid here →
Your path to submission
- Deadline: 22 September at 14:00 — 3 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 16% of this buyer's awards went to companies that had already won here before (248 awards since 2018, spread over 160 companies). 84% went to new names.n = 248 awards since 2018
- The median procedure drew 4 bids (116 procedures with a bid count); 21% ended with a single bidder. Sector: median 3 bids.n = 116
- 9% of awards went to companies from abroad (248 awards with a known winner country). Sector average: 1%.n = 248
- The award came in at a median 90% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 93%.n = 12
- 77% of the bids received came from small and medium-sized enterprises (11 procedures with a bid mix).n = 11
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Finland · Construction materials, 4 contracts went to foreign companies over the last 3 years (of 792 recorded awards).
Typical field: median 3 (from 539 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project) This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. Please note that maximum price for the Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage is 1 000 000 euros (without VAT). Procurement unit can not accept tenders exceeding this amount.,
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Netum Oy (1100539-2)//Studyo Oy | 4 | 2022–2024 |
| Bruker Nordic AB | 4 | 2024–2025 |
| Ilona IT Oy | 3 | 2024 |
| Netum Oy · TAMPERE | 3 | 2023–2026 |
| Martela Oyj | 3 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.