Kaivoksela School renovation and space modifications

Kaivokselan koulu korjaus ja tilamuutokset

Finland · how to bid here

Your path to submission

  1. Deadline: 19 November at 14:00 — 64 days left.
  2. You submit on Hilma — not here and not by e-mail.
  3. Offer and evidence in: FIN.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (38 awards, most recently June 2026) — the next award is due around September 2026 by that rhythm. The last award went to Vantaan Energia Sähköverkot Oy.n = 38
  • 12% of this buyer's awards went to companies that had already won here before (795 awards since 2017, spread over 456 companies). That is well below the sector norm (30%) — this buyer switches suppliers more often than others.n = 795 awards since 2017
  • The award came in at a median 59% of the estimated value (29 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 29
  • The median procedure drew 5 bids (494 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 494
  • 4% of awards went to companies from abroad (795 awards with a known winner country). Sector average: 1%.n = 795

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 16/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Finland · Construction work, 6 contracts went to foreign companies over the last 3 years (of 5,027 recorded awards).

Typical field: median 18 (from 27 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in FIN.

Contract

BuyerVantaan kaupunki
TypeWorks
Estimated value8.000.000 €
Published16 September 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
Kreate Oy52024–2025
Lännen Tractors Oy42020–2026
Aluetaito Oy (FI23180956)//Proxion Plan Oy (FI22615698)//Ramboll Finland Oy (FI01011975)//Maveplan Oy (FI16800248)//Sweco Finland Oy42020–2024
Linea Konsultit Oy (1639698-6)//Ramboll Finland Oy (0101197-5)//Sitowise Oy · ESBO42020–2026
AEL-Amiedu Oy32024–2025
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202025
202118
20229
202312
202441
202540
202631

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineThursday 19 November at 14:00

How to bid

Open Hilma and search there for:
57154
The notice carries this number on the portal. If the search finds nothing, try the title or the buyer.