"Доставка на природен газ за ТП на НОИ - Сливен"
Bulgaria · how to bid here →
Your path to submission
- Deadline: 14 October at 23:59 — 11 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 17% of this buyer's awards went to companies that had already won here before (13 awards since 2021, spread over 6 companies). That is well below the sector norm (56%) — this buyer switches suppliers more often than others.n = 13 awards since 2021
- 23% of awards went to companies from abroad (13 awards with a known winner country). Sector average: 0%.n = 13
- The median procedure drew 2 bids (8 procedures with a bid count); 13% ended with a single bidder. Sector: median 1 bids.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
Among 6,545 recorded awards in Bulgaria · Petroleum & fuels over 3 years, no foreign winner yet — bidding here means being a pioneer.
Typical field: median 1 (from 4,998 awards).
What the buyer is looking for
The subject of this public procurement is “Supply of natural gas for TA of NSSI – Sliven”. The contract includes within its scope the supply of natural gas, which is necessary for heating the administrative building of the territorial unit. The place of performance of the contract is the administrative building of the National Social Security Institute – Sliven, located at: 10 Stefan Karadzha Blvd., Sliven – the Gas Measurement Point (GMP). The estimated value of the contract may not exceed EUR 31316,63 (thirty-one thousand three hundred and sixteen euros and sixty-three cents) excluding VAT. The period for performance of the order/contract is 24 (twenty-four) months or until the estimated value is reached, whichever is the earlier. The estimated amount of natural gas needed for the needs of the TA of the NSSI – Sliven for 24 (twenty-four) months is 250.11 MWh and is determined on the…
Show full description
… basis of the previous 24-month consumption period. The estimated quantity of natural gas indicated is indicative, which is why, when performing the public contract, the contracting authority will pay the tenderer selected as contractor only the quantity of natural gas actually consumed for the relevant period.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ТЕРМОСВЯТ БГ ЕООД | 2 | 2025 |
| СЕКЮРИТИ БУРГАС СОТ ООД | 2 | 2026 |
| РЕЙБ ЕООД | 1 | 2021 |
| КЛИМАТ СЕРВИЗ ЕООД | 1 | 2023 |
| "ГАЗТРЕЙД СЛИВЕН" ЕООД | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
894532