Инженеринг- проектиране, строителство и авторски надзор за обект: "Изпълнение на мерки за енергийна ефективност и ремонт на Спортен комплекс „Ялта“, гр. Русе, ул. „Драма“ №13"
Bulgaria · how to bid here →
Your path to submission
- Deadline: 21 October at 23:59 — 18 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (58 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ПЪТИНЖЕНЕРИНГ АД.n = 58
- 58% of this buyer's awards went to companies that had already won here before (902 awards since 2018, spread over 243 companies). 42% went to new names.n = 902 awards since 2018
- The award came in at a median 79% of the estimated value (121 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 121
- 8% of awards went to companies from abroad (902 awards with a known winner country). Sector average: 0%.n = 902
- The median procedure drew 2 bids (749 procedures with a bid count); 40% ended with a single bidder. Sector: median 2 bids.n = 749
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 2 (from 53 awards).
What the buyer is looking for
The implementation of the public procurement includes the activities related to the preparation of an investment project in the technical design phase, the execution of the necessary construction, as well as the exercise of author's supervision during the construction. Implementation through engineering is envisaged, which should include three main groups of activities: 1. Activities related to the development of an investment project in the technical design phase of the site, as well as activities constituting a condition, consequence or addition to it; 2. Activities related to the execution of author's supervision during the execution of construction and installation works (CMP) on the site and 3. Activities related to the implementation of construction and installation works for the realization of the site. 4. Removal of defects within the warranty periods. In accordance with Article…
Show full description
… 48(1) of the Public Procurement Act, the necessary characteristics of the subject matter of the public contract are specified in detail in the technical specifications of the public contract, contained in a separate document.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| МАКЛЕР-96 ЕООД | 33 | 2021–2026 |
| АСПЕКТ ООД | 28 | 2018–2026 |
| ПЪТИНЖЕНЕРИНГ АД | 27 | 2018–2026 |
| СС-КОНСУЛТ ЕООД | 23 | 2025–2026 |
| ГЕОДЕЗИЯ-97 ЕООД | 20 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.