Инженеринг - проектиране, изпълненение на строително-монтажни работи и упражняване на авторски надзор на обект: Основен ремонт на паркинг при Арена "Русе"
Bulgaria · how to bid here →
Your path to submission
- Deadline: 21 October at 23:59 — 18 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (58 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ПЪТИНЖЕНЕРИНГ АД.n = 58
- 58% of this buyer's awards went to companies that had already won here before (902 awards since 2018, spread over 243 companies). 42% went to new names.n = 902 awards since 2018
- The award came in at a median 79% of the estimated value (121 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 121
- 8% of awards went to companies from abroad (902 awards with a known winner country). Sector average: 0%.n = 902
- The median procedure drew 2 bids (749 procedures with a bid count); 40% ended with a single bidder. Sector: median 2 bids.n = 749
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 2 (from 53 awards).
What the buyer is looking for
The site of the PP is "Underground parking at an elevation of -4.10 m and technical service rooms at an elevation of ±0.00; -8.10 m and -11.60 m, owned by the Municipality of Ruse’. At the moment, it is in poor condition and it is impossible to use its full capacity. It is necessary to complete and restore the systems under parts "Fire-fighting water supply", "Water supply", "HVAC" and "Electro", according to the current regulatory requirements for safety and functionality. At level -3 partial polished concrete is executed. The walls, columns and beams are at the stage of “visible concrete”, without post-treatment. At levels -1 and -2, the floor, walls and ceiling are made of visible concrete after decoding, without finishing works.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| МАКЛЕР-96 ЕООД | 33 | 2021–2026 |
| АСПЕКТ ООД | 28 | 2018–2026 |
| ПЪТИНЖЕНЕРИНГ АД | 27 | 2018–2026 |
| СС-КОНСУЛТ ЕООД | 23 | 2025–2026 |
| ГЕОДЕЗИЯ-97 ЕООД | 20 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.