Friedrich & ClementBETA

Въвеждане на енергоспестяващи мерки в съответствие с предвижданията на обследване за енергийна ефективност на ДГ „Еделвайс“ в гр. Етрополе, община Етрополе

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 26 October at 23:59 — 23 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (37 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ЕМ ДЖИ СТРОЙ ГРУП ЕООД.n = 37
  • 48% of this buyer's awards went to companies that had already won here before (96 awards since 2018, spread over 44 companies). That is well below the sector norm (61%) — this buyer switches suppliers more often than others.n = 96 awards since 2018
  • The award came in at a median 92% of the estimated value (15 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 15
  • The median procedure drew 2 bids (94 procedures with a bid count); 46% ended with a single bidder. Sector: median 2 bids.n = 94
  • 0% of the bids received came from small and medium-sized enterprises (19 procedures with a bid mix). Sector: 17%.n = 19

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).

Typical field: median 2 (from 37 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Within the scope of the procurement, the following energy efficiency measures are envisaged to be implemented: ESM 1 - Thermal insulation of the roof of the building: The measure for the roof provides for the supply and installation of thermal insulation material "XPS" above the roof slab with a total area of 465.35m2 - making reinforced cement screed, and laying two-layer waterproofing. -Thermal insulation material thickness δ = 0.12m -Thermal conductivity coefficient λ ≤ 0.030W/mK. ESM 2 - Thermal insulation of floors: This measure provides for the thermal insulation of the adjoining walls of the basement bordering external air (the plinth), namely TYPE 1 walls with a total area of 135.99m2 with external thermal insulation with XPS with a thickness of 120 mm and a thermal conductivity coefficient not higher than λ ≤ 0.030W/mK. EJN 3 - Measures on building systems: Reconstruction of the…

Show full description

… heating system is planned for operation with floor fan convectors. After the installation of the new heater - air-water chillers will be able to serve as cooling of the building. ESM 4 - Installation of a modern heater - air-water chillers: It is planned to install 2 pcs. - air-water chillers each with a cooling capacity of 71.3 kW, heating capacity at 65° C on the water 82.9 kW, electric power 25.5 kW. Their advantage is that if a photovoltaic system is installed on the roof of the building to produce electricity for their own needs, their power supply will save a large amount of primary energy and serve as heating, DHW and cooling of the building during the summer period. ESM 5 - Delivery and installation of measuring, control and control instruments: To regulate the temperature of the supply water to the heating system depending on the outside air temperature and the temperature in a typical room of the building, a control system will be installed through a regulator with a three-way IM. EJN 6 - Improving the efficiency of the DHW system: To increase the efficiency of the system, it is envisaged to bind the DHW system to chillerite

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerОБЩИНА ЕТРОПОЛЕ
TypeWorks
Estimated value276.493 €
Published1 October 2026
CategoryConstruction work · CPV 45212000

Who has won here before

CompanyAwardsPeriod
НИВЕЛ СТРОЙ ЕООД112025–2026
ТЕХНОСТРОЙ - ИНВЕСТКОНСУЛТ ЕООД52025–2026
АСТРА КОНСУЛТ ЕООД42025–2026
АГРО ЛОПЯН 2012 ООД42023
ПЕТРОЛ АД42020–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202423
202542
202628

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 26 October at 23:59

How to bid

Open ЦАИС ЕОП and search there for:
908130
The notice carries this number on the portal. If the search finds nothing, try the title or the buyer.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Въвеждане на енергоспестяващи мерки в съответствие с предвижданията на — Friedrich & Clement