Engineering – including design, execution of construction and installation works and exercising author's supervision of the object: "Repair and reconstruction of road and water supply network on streets "Moskovska", "Rila", "Zora" and "Lyuben Karavelov" in the city of Gulyantsi"
Инженеринг – включително проектиране, изпълнение на СМР и упражняване на авторски надзор на обект: „Ремонт и реконструкция на пътна и водопроводна мрежа на улици „Московска“, „Рила“, „Зора“ и „Любен Каравелов“ в гр. Гулянци“
Bulgaria · how to bid here →
Your path to submission
- Deadline: 19 October at 23:59 — 15 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (25 awards, most recently July 2026) — the next award is due around October 2026 by that rhythm. The last award went to ВИАГРУП ЕООД.n = 25
- 57% of this buyer's awards went to companies that had already won here before (68 awards since 2018, spread over 26 companies). 43% went to new names.n = 68 awards since 2018
- The median procedure drew just one bid (64 procedures with a bid count); 53% ended with a single bidder. Sector: median 2 bids.n = 64
- 1% of awards went to companies from abroad (68 awards with a known winner country). Sector average: 0%.n = 68
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,146 recorded awards).
Typical field: median 1 (from 24 awards).
What the buyer is looking for
Continuation from section Description(BT-24-Procedure): 2.1.4 Overhaul of Lyuben Karavelov Street from 279 to 329 to 328, Gulyantsi. Lyuben Karavelov Street is part of the secondary street network of Gulyantsi / PI with ID 18099.401.2201 /. The length of the street is about 160 m from 279 to 329 to 328, and the roadway has a width of 6.00 m. From G.S. Rakovski Street to Pleven Street, it is on crushed stone / PI with ID 18099.401.2201/. The pavement is highly compromised, with multiple holes, patches, bumps, and mesh cracks, making it difficult to drain and leading to the destruction of the road structure. On both sides of the street there are partial concrete curbs, which for the most part have fallen, crumbled and broken. Sidewalks are missing. The street is not signalled with horizontal road markings. There is a partial vertical signalling. 3. Pursuant to Article 137(1)(4)(a) of the…
Show full description
… Spatial Development Act, the site is the fourth category. The project should contain the following parts: 1. Geodesy part; 2. Road part, 3. Part ‘Water supply’, 4. Part "Temporary organisation and traffic safety"; 5. Fire safety part; 6. Part ‘Safety and Health Plan’; 7. Part ‘Construction waste management plan’. 2. ACTIVITY 2 : Construction / Construction works The execution of construction works is carried out in accordance with Part Three "Construction" of the Spatial Development Act and starts after a building permit issued by the competent authorities has entered into force. The participants in the construction and the relations between them are determined by the requirements of Section Two, Part Three of the Spatial Development Act and by the obligations set out in the Technical Specifications and in the draft contract for the performance of the public procurement. The builder (legal entity with the relevant competence) performs the construction works in accordance with the approved technical design in accordance with the issued construction papers,
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| КОНСУЛТИ 03 ООД | 10 | 2024–2025 |
| ВИАГРУП ЕООД | 7 | 2023–2026 |
| ЕКО ДН 2011 ЕООД | 5 | 2018–2024 |
| ИНФРАКЪНСТРАКШЪН ЕАД | 5 | 2025–2026 |
| ЛУКИ ЕООД | 4 | 2019–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.