Selection of a contractor for the performance of construction works on the object: "IMPROVEMENT AND RECONSTRUCTION OF STREET "HRISTO SMIRNENSKI" FROM POINT 57 TO POINT 230 ACCORDING TO THE PLAN OF RAKITOVO TOWN, MUNICIPALITY OF RAKITOVO"
Избор на изпълнител за изпълнение на СМР на обект: „БЛАГОУСТРОЯВАНЕ И РЕКОНСТРУКЦИЯ НА УЛИЦА „ХРИСТО СМИРНЕНСКИ“ ОТ О.Т. 57 ДО О.Т. 230 ПО ПЛАНА НА ГР. РАКИТОВО, ОБЩ. РАКИТОВО“
Bulgaria · how to bid here →
Your path to submission
- Deadline: 19 October at 23:59 — 16 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (39 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ПРОФЕСИОНАЛ-777 ЕООД.n = 39
- 61% of this buyer's awards went to companies that had already won here before (136 awards since 2018, spread over 49 companies). 39% went to new names.n = 136 awards since 2018
- The median procedure drew 2 bids (133 procedures with a bid count); 39% ended with a single bidder. Sector: median 2 bids.n = 133
- 0% of the bids received came from small and medium-sized enterprises (27 procedures with a bid mix). Sector: 17%.n = 27
- The award came in at a median 99% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).
Typical field: median 1 (from 38 awards).
What the buyer is looking for
Continuation from section Description(BT-24-Procedure): Construction of the traffic lane: The traffic canvas is intended to be built with the following construction: - 5 cm. - dense asphalt concrete with E=1200MPa; - Second bitumen spill; - 4 cm. to 6 cm. (average 5 cm.) – non-dense asphalt concrete with E=1200 MPa; - First bitumen spill; - 15 cm. - crushed stone / fraction 0-40 mm./ with E=450 MPa; - 35 cm. – crushed stone / fraction 0-63 mm./ for a base layer with E=300 MPa; - earth base, compacted up to 40 MPa. Road structure for discharges: - Solid asphalt concrete 4 cm. with E=1200 MPa; - Second bitumen spill; - Non-dense asphalt concrete - 5 cm. with E=1200 MPa; - First bitumen spill; - Unsorted crushed stone / fraction 0-40mm/ with E=300 MPa – 10 cm; The laying of the asphalt layers should be carried out in dry weather at an air temperature above +5° C. The construction of the…
Show full description
… sidewalks will be carried out as follows: - 6.0 cm. – pavement pavement of pavement tiles 20x20; - 5.0 cm. earthy moist screed; - 30.0 cm thick – crushed stone /0-63 mm / for a base layer; - earth base, compacted to E=30MPa. The implementation of all construction and installation works must comply with the ‘Technical Specification 2014’ of the Road Infrastructure Agency. Drainage Surface drainage will be carried out from the transverse and longitudinal slopes of the road surface, directed to the existing rain shafts. It is envisaged to clean, profile, unclog and replace the covers of all existing rain shafts within the scope of the project. Cleaning shall be carried out by hydrodynamic cleaning. All rain and inspection shafts are planned to be adjusted to the design level of the street! Functional purpose – street V/VI-class, Traffic category – low. The transport and technical characteristics are: - Intersection mode – regulated by road signs B1, B2 and B3; - Design speed Vr = 30 km/h; The location of all intended road signs, as well as the type and quantity of road markings, are shown in the graphic cha
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| БОЖИЛОВ ЕООД | 21 | 2026 |
| РТ ПРОЕКТ ООД | 15 | 2024–2026 |
| Екоконсулт Пловдив ЕООД | 12 | 2024–2026 |
| Делчев Инженеринг ООД | 11 | 2024–2026 |
| Д2 Строй ЕООД | 8 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.