Selection of a contractor for the execution of construction and installation works on the object: "Project for major repair of "Nikola Ferezliev" street from point 136 to point 199 in the village of Dorkovo, municipality of Rakitovo"
Избор на изпълнител за изпълнение на СМР на обект: „Проект за основен ремонт на ул.“Никола Ферезлиев“ от о.т.136 до о.т.199 в с.Дорково, общ.Ракитово”
Bulgaria · how to bid here →
Your path to submission
- Deadline: 19 October at 23:59 — 16 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (39 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ПРОФЕСИОНАЛ-777 ЕООД.n = 39
- 61% of this buyer's awards went to companies that had already won here before (136 awards since 2018, spread over 49 companies). 39% went to new names.n = 136 awards since 2018
- The median procedure drew 2 bids (133 procedures with a bid count); 39% ended with a single bidder. Sector: median 2 bids.n = 133
- 0% of the bids received came from small and medium-sized enterprises (27 procedures with a bid mix). Sector: 17%.n = 27
- The award came in at a median 99% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).
Typical field: median 1 (from 38 awards).
What the buyer is looking for
Continuation from section Description(BT-24-Procedure): B.2.5.Implementation of construction and installation works Tests and measurements of construction and installation works should be performed by certified laboratories and certified by protocols. It is mandatory to take laboratory samples of the ground and road foundations before the implementation of the next structural layers. The repair should be carried out in the following sequence of the works: 1. Excavation for road foundation, incl. loading of transport removal of landfill; 2. Excavation for pavement foundation, incl. loading of transport and removal of landfill; 3. Delivery and laying of NTK 0/63 for road foundation, incl. profiling and sealing 4. Delivery and laying of NTK 0/63 for paving base, incl. sealing 5. Delivery and installation of new concrete curbs 15/25/50, incl. all related resources 6. Delivery and…
Show full description
… installation of new concrete curbs 8/16/50, incl. all related resources 7. Delivery and laying of paving slabs 20/20/6, incl. all related resources 8. Reconstruction of existing WS9. Racketing of existing SRs to project level 10. Laying the first bitumen spill for connection 11. Laying non-dense asphalt concrete /binder/-6cm 12. Laying a second bitumen spill for connection 13. Laying a wear layer of solid asphalt concrete type A with a constant thickness of 4 cm 14. Delivery and installation of vertical signaling 15. Laying horizontal marking. B.2.6.Specification of materials The materials used in the construction and installation works must meet the technical requirements for construction products in accordance with Ordinance No RD-02-20-1/5.2.2015 on the conditions and procedure for the incorporation of construction products into the construction works of the Republic of Bulgaria. Conformity will be certified in accordance with the same regulation. Construction products intended for permanent incorporation into the site must be suitable for their intended use and satisfy the basic requirements for construction works for economic justification
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| БОЖИЛОВ ЕООД | 21 | 2026 |
| РТ ПРОЕКТ ООД | 15 | 2024–2026 |
| Екоконсулт Пловдив ЕООД | 12 | 2024–2026 |
| Делчев Инженеринг ООД | 11 | 2024–2026 |
| Д2 Строй ЕООД | 8 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.