Friedrich & ClementBETA

Selection of a contractor for the exercise of construction supervision during the performance of construction and installation works on the object: "Repair and reconstruction of road and water supply network on streets "Moskovska", "Rila", "Zora" and "Lyuben Karavelov" in the city of Gulyantsi"

Избор на изпълнител за упражняване на строителен надзор при изпълнение на СМР на обект: „Ремонт и реконструкция на пътна и водопроводна мрежа на улици „Московска“, „Рила“, „Зора“ и „Любен Каравелов“ в гр. Гулянци“

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 19 October at 23:59 — 15 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (21 awards, most recently June 2026) — by that rhythm the next award was due around July 2026. The last award went to Друм Супервижън ЕООД.n = 21
  • 57% of this buyer's awards went to companies that had already won here before (68 awards since 2018, spread over 26 companies). That is well below the sector norm (71%) — this buyer switches suppliers more often than others.n = 68 awards since 2018
  • The median procedure drew just one bid (64 procedures with a bid count); 53% ended with a single bidder. Sector: median 2 bids.n = 64
  • 1% of awards went to companies from abroad (68 awards with a known winner country). Sector average: 0%.n = 68

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Bulgaria · Architecture & engineering, 6 contracts went to foreign companies over the last 3 years (of 12,514 recorded awards).

Typical field: median 3 (from 21 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Continuation of section Description (BT-24-Procedure):8) controls the quality of the works carried out and prevents by its actions under its competence the violation of their technological consistency by issuing prescriptions and orders, which it enters in the order book of the construction: 8.1. monitoring the correct observance of the technological sequence in the implementation of the construction works for the construction on the basis of the contract with the contractor of the construction works, as well as good construction practices; 8.2. entry in the order book of orders in cases where the construction works deviate from the sequence resulting from the contract with the contractor of the construction works and/or good construction practices. 9) constant monitoring of compliance with the schedules for the implementation of the construction works (including the annexes), as well as…

Show full description

… monitoring for deviations from them and timely reporting to the contracting authority on any deviations that have occurred in the process of implementation of the works. Requiring measures by the contractor for the works contract to correct deviations, as well as monitoring compliance with these measures and, if necessary, reporting on the latter. 9.1. prior detailed knowledge of the content of the schedule proposed by the Contractor of the works, as well as, in case of applicability, an updated one; 9.2. control over their compliance with the real progress of the construction works and, if necessary, informing the Contracting Authority. Accompanying activities: • ensuring compliance with occupational safety conditions, in accordance with the Occupational Health and Safety Act (OSH Act) and its regulations; • preventing damage to third parties and properties as a result of construction; • ensuring the necessary organization for effective supervisory activity and communication of its team regarding the lawful start of the construction, the checks related to the implementation of the construction in accordance with the approved investment projects and the requirements under Article 169(1) and (3) of the Spatial Development Act; • checks for the presence of the author's supervision on the relevant parts of the technical

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerОБЩИНА ГУЛЯНЦИ
TypeServices
Estimated value34.075 €
Published29 September 2026
CategoryArchitecture & engineering · CPV 71521000

Who has won here before

CompanyAwardsPeriod
КОНСУЛТИ 03 ООД102024–2025
ВИАГРУП ЕООД72023–2026
ЕКО ДН 2011 ЕООД52018–2024
ИНФРАКЪНСТРАКШЪН ЕАД52025–2026
ЛУКИ ЕООД42019–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202410
202523
202611

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 19 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Selection of a contractor for the exercise of construction supervision during the performance of construction and installation works on the object: "Repair and reconstruction of road and water supply network on streets "Moskovska", "Rila", "Zora" and "Lyuben Karavelov" in the city of Gulyantsi"