"Implementation of construction supervision during reconstruction of streets in the territory of Rudozem municipality"
„Осъществяване на строителен надзор при реконструкция на улици на територията на община Рудозем“
Bulgaria · how to bid here →
Your path to submission
- Deadline: 9 October at 23:59 — 6 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (20 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to КАДИЕВ КОНСУЛТ ЕООД.n = 20
- 47% of this buyer's awards went to companies that had already won here before (120 awards since 2018, spread over 52 companies). That is well below the sector norm (71%) — this buyer switches suppliers more often than others.n = 120 awards since 2018
- The median procedure drew 2 bids (100 procedures with a bid count); 49% ended with a single bidder. Sector: median 2 bids.n = 100
- 4% of awards went to companies from abroad (120 awards with a known winner country). Sector average: 0%.n = 120
- 0% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 13%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Bulgaria · Architecture & engineering, 6 contracts went to foreign companies over the last 3 years (of 12,479 recorded awards).
Typical field: median 2 (from 17 awards).
What the buyer is looking for
The scope of the contract includes the exercise of construction supervision during the execution of construction and installation works on approved investment projects for the reconstruction of a total of three streets on the territory of the municipality of Rudozem. The activities are aimed at improving the technical infrastructure, the condition of street pavements, drainage, traffic safety and accessibility of the environment in the respective settlements. Lyuben Karavelov Street, Quarter Lyuben Karavelov ‘Vazrazhdane’, Rudozem is Class VI Street, with a total length of 565.70 m. A building permit has been issued for the construction, and the construction has been classified as a fourth category in accordance with Article 137(1)(4) of the Spatial Development Act and Regulation No 1 of 30 July 2003 on the nomenclature of types of construction. Snezhanka Street, Chepintsi village is 4th…
Show full description
… class street, with a total length of 695.95 m. A building permit has been issued for the construction, and the construction has been classified as a fourth category under Article 137(1)(4) of the Spatial Development Act and Regulation No 1 of 30 July 2003 on the nomenclature of types of construction. Bratya Miladinovi Street, Quarter Bratya Miladinovi ‘Vazrazhdane’, Rudozem is Class VI Street, with a total length of 275.64 m. A building permit has been issued for the construction, and the construction has been classified as a fourth category in accordance with Article 137(1)(4) of the Spatial Development Act and Regulation No 1 of 30 July 2003 on the nomenclature of types of construction.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| АРТСТРОЙ ООД | 12 | 2018–2026 |
| ЕТ АНРИ-64 - АНДРЕЙ КЕХАЙОВ | 8 | 2018–2024 |
| КАДИЕВ КОНСУЛТ ЕООД | 6 | 2024–2026 |
| АЛФАБЕТ КОНСУЛТ ЕООД | 5 | 2025–2026 |
| КРЕАТИВ БИЛД ЕООД | 4 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.