Increasing the volume of the lower equalizer of the PAVEC "Chaira" by constructing the "Yadenitza" dam and a reversible pressure tunnel connecting to the "Chaira" dam, ref. No. 26IP-R19A101
Увеличаване на обема на долния изравнител на ПАВЕЦ „Чаира“ с изграждане на язовир „Яденица“ и реверсивен напорен тунел за връзка с язовир „Чаира“, реф. № 26ИП-Р19А101
Bulgaria · how to bid here →
Your path to submission
- Deadline: 4 November at 23:59 — 32 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (68 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to КРЕВ 21 ООД.n = 68
- The award came in at a median 69% of the estimated value (111 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 111
- 52% of this buyer's awards went to companies that had already won here before (967 awards since 2017, spread over 346 companies). 48% went to new names.n = 967 awards since 2017
- 11% of awards went to companies from abroad (967 awards with a known winner country). Sector average: 0%.n = 967
- 41% of the bids received came from small and medium-sized enterprises (160 procedures with a bid mix). Sector: 17%.n = 160
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 2 (from 55 awards).
What the buyer is looking for
The subject-matter of the public contract includes the execution of construction and installation works and the preparation of executive documentation for a site: “Increasing the volume of the lower leveler of the Chaira PSHPP with the construction of the Yadenitsa dam and a reverse pressure tunnel for connection to the Chaira dam. The main sub-sites of the project are: • Dam wall and adjoining facilities incl. Injection gallery; Shakhtov overflow with drainage gallery, fast and energy extinguisher; Primary exhaust; Control measuring system; Small hydroelectric power plant of ecological waters; An embankment for strengthening the shore of the dam lake in the area of Yadenishki Fault; Reinforcement of a landslide in the area of the temporary explosive depot at the Yadenitsa site; Anti-erosion protection of the slope above the energy extinguisher of the dam to the connection road with the…
Show full description
… crown of the wall; Anti-erosion protection of excavation slopes on an operating road along the left bank of the Yadenitsa river, section from km 4+860 to km 5+770; Correction of the Yadenitsa river after the dam; Connection of fixed facilities (users) to a 20 kV district network during operation and back-up power supplies; • Reversible pressure tunnel and adjoining facilities with sub-sites: Reversible pressure tunnel; Yadenitsa Entrance Facility; Yadenitsa Savava Shaft, Chaira Savava Shaft; Systems for filling and emptying the tunnel with a camera apparatus and the tunnel for access to a camera apparatus; Reversible pressure tunnel access window; Displacement of water supply for Chaira PSHPP from Manavsko gully; • Operating roads; • Service building; Physical protection system. The execution of the contract will be carried out according to a detailed design prepared and approved by the Contracting Authority and the Ministry of Regional Development and Public Works, the technical specification, incl. additional technical requirements of the Contracting Authority for the contract. The work project for the implementation of the site, with additional instructions on pricing and technical requirements will be provided with the invitation for participation of the admitted candidate
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Кандидатът трябва да притежава регистрация в Централния професионален регистър на строителя (ЦПРС) към Камарата на строителите в Република България, съгласно чл. 3, ал. 2 от Закона за Камарата на строителите (ЗКС), а за чуждестранно лице – в аналогични регистр… ▸▾
Кандидатът, за последните три приключили финансови години, да е реализирал минимален общ оборот, изчислен на база годишните обороти. Минимално изискване: Всеки кандидат за последните три приключили финансови години да е реализирал минимален общ оборот в размер… ▸▾
Кандидатът да притежава застраховка „Професионална отговорност“, съгласно чл. 171, ал. 1 от Закона за устройство на територията (ЗУТ) за лицето/ -ата, което/които ще изпълнява/-т строителството, за строежи „първа категория“, съгласно чл. 137, ал. 1, т. 1 , б. … ▸▾
Кандидатът трябва да е изпълнил през последните 15 (петнадесет) години, считано от датата на подаване на заявление за участие дейности с предмет, идентичен или сходен с този на поръчката. Минимално изискване: Кандидатът трябва да е изпълнил най-малко 1 (една) … ▸▾
Кандидатът трябва да разполага с персонал и с ръководен състав с определена професионална компетентност за изпълнение на поръчката. Минимално изискване: - 1 (едно) лице - технически ръководител на обекта, притежаващ удостоверение за придобита квалификация стро… ▸▾
Кандидатът да прилага система за управление на качеството в съответствие със стандарт БДС ЕN ISO 9001:2015 /или еквивалент/ с обхват в областта на строителството. Кандидатът декларира това обстоятелство в ЕЕДОП, част IV „Критерии за подбор“, буква Г: „Стандарт… ▸▾
Кандидатът да има внедрена система за опазване на околната среда БДС EN ISO 14001:2015 /или еквивалентна/ с обхват в областта на строителството. Кандидатът декларира това обстоятелство в ЕЕДОП, част IV „Критерии за подбор“, буква Г: „Схеми за осигуряване на ка… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ТОП ЕЛАНА ООД | 58 | 2022–2026 |
| ЦЕНТРАЛНА ЕНЕРГОРЕМОНТНА БАЗА ЕАД | 19 | 2019–2026 |
| ИНЖЕНЕРИНГ КОНСУЛТ ЕС ЕООД | 15 | 2022–2026 |
| АСТРА КОНСУЛТ ЕООД | 12 | 2025–2026 |
| ЧЕРНОМОРСКИ ВОДОЛАЗЕН ЦЕНТЪР ООД | 12 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.