Friedrich & ClementBETA

Selection of a Contractor for the Performance of Construction and Installation Works on the Object: "Reconstruction of Water Supply Network on "Hristo Botev" Street, "Bratya Krastini" Street, "Malina Todorova" Street and "Docent Dr. Vasil Tashev" Street: SECOND STAGE: "Reconstruction of Water Supply Network on "Bratya Krastini" Street, "Hristo Botev" Street and "Docent Dr. Vasil Tashev" Street"

Избор на изпълнител за изпълнение на СМР на обект: „Реконструкция на водопроводна мрежа по ул. „Христо Ботев“, ул.„Братя Кръстини“, ул. „Малина Тодорова“ и ул. „Доц. д-р Васил Ташев“: ВТОРИ ЕТАП: „Реконструкция на водопроводната мрежа по ул.“Братя Кръстини“, ул.“Христо Ботев“ и ул.“Доц. д-р Васил Ташев“

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 19 October at 23:59 — 16 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (39 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ПРОФЕСИОНАЛ-777 ЕООД.n = 39
  • 61% of this buyer's awards went to companies that had already won here before (136 awards since 2018, spread over 49 companies). 39% went to new names.n = 136 awards since 2018
  • The median procedure drew 2 bids (133 procedures with a bid count); 39% ended with a single bidder. Sector: median 2 bids.n = 133
  • 0% of the bids received came from small and medium-sized enterprises (27 procedures with a bid mix). Sector: 17%.n = 27
  • The award came in at a median 99% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 21

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
When comparable contracts were last awarded here, usually just a single offer was on the table — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).

Typical field: median 1 (from 38 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Continuation from the Description section (BT-24-Procedure):The existing water main on Bratya Krastini Street in the section between Lipa Street and Alexander Stamboliyski Street is executed by F200 /AC /which plays the role of main water main / and by F100 stoma. /to which are connected the building plumbing deviations to the properties in this section of the street/. Considering that there are two water pipes in the section and in order to preserve the highway nature of the water pipe, it is envisaged that the new water pipe will be filled with reinforced polyethylene pipes DN 160 mm /PERC; PN10/, which will also carry out the transfer of a basic amount of water for the future establishment of a “Low Zone” for the water supply of the city. The existing water supply line on Hristo Botev Street in the section between Alexander Stamboliyski Street and Todor Tuparov Street is completed by…

Show full description

… AC 80mm and is part of the secondary water supply network of the town of Rakitovo. Given that at the next stage a new “Low Zone” will be designated for the water supply of the city, it is envisaged that the new water supply line will be filled with reinforced polyethylene pipes DN 160mm /PERC;PN10/, which will be the main water supply branch of this zone. The existing water supply on “Assoc. “Vasil Tashev” in the section between Hristo Botev Street and Ivan Klincharov Street is executed by AC f60mm and is part of the secondary water supply network of Rakitovo The closest to its diameter is DN90, according to the requirements of the regulatory documents for the minimum diameter of street water supply. The new plumbing should be filled with reinforced polyethylene pipes DN 90mm /PERC;PN10/. Existing water pipes are laid at a depth of 1.60m. During the reconstruction of the water pipes, the new ones should be laid at the same depth. All water pipes will be polyethylene high density for working pressure 10 atm. It is envisaged that the connections between the pipes will be made on a front weld for the plumbing branches and on a quick installation connection for the building deviations. Plumbing will be laid at 1.00m from y

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerОБЩИНА РАКИТОВО
TypeWorks
Estimated value294.397 €
Published28 September 2026
CategoryConstruction work · CPV 45232150

Who has won here before

CompanyAwardsPeriod
БОЖИЛОВ ЕООД212026
РТ ПРОЕКТ ООД152024–2026
Екоконсулт Пловдив ЕООД122024–2026
Делчев Инженеринг ООД112024–2026
Д2 Строй ЕООД82024–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202428
202533
202651

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 19 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →